My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-103
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 1:48:24 PM
Creation date
9/30/2015 7:30:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-103
Agenda Item Number
11.I.2
Entity Name
Timothy Rose Construction
Subject
Contract and Specifications 4th St. Widening US 1 to West of Old Dixie
Project Number
9205
Bid Number
6028
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3756
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' SECTION 01050 <br /> FIELD ENGINEERING AND LAYOUT <br /> 1 . 1 GENERAL <br /> A . The CONTRACTOR will furnish all construction staking for the project . All <br /> ' staking from control will be under the supervision of a Florida Registered Land <br /> Surveyor. <br /> B . Develop and make all detail surveys and measurements needed for <br /> ' construction including but not limited to , slope stakes , batter boards , piling <br /> layouts and all other working lines , elevations and cut sheets . <br /> C . Keep a transit and leveling instrument on the site at all times and a skilled <br /> ' instrument man available whenever necessary for layout of the Work . <br /> D . Provide all material required for benchmarks , control points , batter boards , <br /> grade stakes , and other items . <br /> ' E . Be solely responsible for all locations , dimensions and levels . No data other <br /> than written orders of the ENGINEER shall justify departure from the <br /> dimensions and levels required by the Drawings . <br /> ' F . Safeguard all points , stakes , grademarks , monuments and benchmarks made <br /> or established on the Work , and reestablish same , if disturbed . Rectify all <br /> Work improperly installed because of not maintaining , not protecting or <br /> ' removing without authorization such established points , stakes , marks and <br /> monuments . <br /> G . When requested by the ENGINEER , provide such facilities and assistance as <br /> ' may be necessary for the ENGINEER to check line and grade points placed by <br /> the CONTRACTOR . Do no excavation or embankment work until all <br /> cross-sectioning necessary for determining pay quantities has been completed <br /> and checked by the ENGINEER . <br /> H . The cost of performing engineering and layout work described above shall be <br /> included in the contract unit prices for the various items of work to which it is <br /> ' incidental . No separate payment will be made for surveying or engineering . <br /> 1 . 2 SURVEY WORK AND QUALIFICATIONS OF SURVEYOR <br /> ' A . Prior to commencing work , the CONTRACTOR shall satisfy himself as to the <br /> accuracy of all survey and existing site information as indicated in the Contract <br /> ' Documents . Immediately notify the ENGINEER upon discovery of any errors , <br /> inaccuracies or omissions in the survey data . The commencing of any of the <br /> work by the CONTRACTOR shall be held as the CONTRACTOR Is acceptance <br /> ' that all survey or existing site information is correct and accurate , without any <br /> reasonably inferable errors , inaccuracies or omissions . <br /> ' 1050- 1 01050 Field Engineering <br /> F :\Public Works\Capital Projects\Fourth Street-Old Dixie-US1 \CONTRACT DOCUMENTS\01050 - Field Engineering .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.