Laserfiche WebLink
r <br /> ' 4 " STREET / OLD DIXIE / US 1 <br /> PRE-BID MEETING <br /> FRIDAY, FEBRUARY 13 , 2004 <br /> ATTENDEES : <br /> ' Terry Thompson IRC Capital Projects tthompsonCa/ircgov . com <br /> Teresa Allen IRC Capital Projects tallen(a)ircgov. com <br /> Chip Boyette IRC Capital Projects cboyette@ircgov. com <br /> ' Dick Destein Sheltra & Son dickdestein (wonearrow . net <br /> Richard J. Forlifer Sheltra & Son <br /> Mike Bullock Community Asphalt mbullock@,cacoEp .net <br /> ' Chad Swint Ranger Construction cswint@rangerconsruction . com <br /> Tim Rose Timothy Rose Contracting, Inc . trosoav@aol. . com <br /> Richard G. Forlifer Dickerson Florida, Inc . Rforlifer a@dfifl. com <br /> Terry opened the meeting. Terry stated the County has been trying to get the utility companies <br /> out of the way before starting the project . Chip stated Comcast still has some work to do . Chip <br /> stated during construction the Contractor will have to work together with Comcast. Chip stated <br /> Comcast needs to go over the drainage pipe in the railway right-of-way after it is installed by the <br /> Contractor. Terry asked if Comcast was going to be doing a jack and bore . Chip stated Comcast <br /> would be doing a directional bore . <br /> Terry stated that on the road construction section there is an abandoned water line that needs to <br /> be removed, drainage pipes that need to be removed and all kinds of wires . Terry stated the <br /> County has gone with a thicker base and no mixed sub -grade . Terry stated there are traffic boxes <br /> that need to be removed. Terry stated if the contractor wanted to grout some of the drainage pipe <br /> instead of removing it, in order to help with the maintenance of traffic, to let her know. <br /> ' Chip stated there is some drainage work that will be located behind some businesses . Chip <br /> stated this work will require small equipment. Terry stated to be careful and not block access to <br /> any of the businesses . Terry also mentioned that the ditch located at Parks Rental that goes out <br /> ' to 4th Street can not be filled in and block drainage until the new drainage is installed . Terry <br /> stated she thinks the most difficult thing related to this job is the maintenance of traffic . <br /> ' Terry mentioned that the contract states that the Contractor has to pay over time for <br /> the <br /> inspectors . <br /> Dick Destein asked if the lines crossing 4th Street do they have to be built in phases or can they <br /> go all the way across . Terry stated she didn ' t see a problem with going all the way across as <br /> long as traffic is flagged and maintained . <br /> rTim Rose asked if it would be considered over time if they worked night hours instead of day <br /> Y <br /> hours . Terry stated as long as they were not working night and day some thing could be worked <br /> out. Tim stated night time work would have less traffic . <br /> i <br /> FAPublic Works\Capital Projects\Fourth Street-Old Dixie- USI \PRE-BID MEETING\PreBid2- 13 -04.doc <br />