My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-103
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 1:48:24 PM
Creation date
9/30/2015 7:30:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-103
Agenda Item Number
11.I.2
Entity Name
Timothy Rose Construction
Subject
Contract and Specifications 4th St. Widening US 1 to West of Old Dixie
Project Number
9205
Bid Number
6028
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3756
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAWINGS ( CONTINUED ) <br /> ' Delete Pay Item Footnote102- 1 on Sheet Number 5 of Drawings and replace it <br /> with the following: <br /> ' 102- 1 : INCLUDES TEMPORARY PAVEMENT, TEMPORARY PAINT STRIPING ( PLACEMENT <br /> AND REMOVAL ) , BARRIER WALLS , VERTICAL PANELS , ATTENUATATORS , SIGNS , <br /> CONES , BARRICADES , WARNING LIGHTS , FEC FLAGMENIWATCHMEN <br /> ' ($500 . 00/DAY) FOR WORK ADJACENT TO FEC RIGHT-OF-WAY IN ACCORDANCE <br /> WITH FEC AGREEMENT , FLAGMEN AND ALL OTHER ITEMS REQUIRED FOR THE <br /> MAINTENANCE OF TRAFFIC , ALSO INCLUDES PROVIDING FOR ADEQUATE AND <br /> PROPER DRAINAGE DURING THE PROCESS OF THE WORK. <br /> PREBID CONFERENCE FRIDAY FEBRUARY 13 2004 <br /> A copy of the minutes to the February 13 Pre-Bid conference is attached. A <br /> copy of the sign -in sheet is also attached. <br /> Listed below is a response to a question asked at the meeting that could not be <br /> ' answered at that time . <br /> • Will the Contractor be responsible for paying for the Florida East Coast <br /> ' Railway ( FEC ) flagmen required by the FEC? <br /> ' • Yes , the Contractor will be responsible for paying the $ 500 /day fee <br /> for an FEC flagmen/watchmen . The Contractor will also be <br /> responsible for calling and scheduling the FEC flagmen /watchmen in <br /> ' accordance with the FEC agreement contained in the Appendix of <br /> the Contract Documents . <br /> ' ADDENDUM NO . 1 <br /> Page 2of2 <br /> ' F : \Public Works\Capital Projects\Fourth Street-Old Dixie-US I \CONTRACT DOCUMENTS\Addendums\Addendum No . l .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.