My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-265
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:13:18 AM
Creation date
9/30/2015 9:53:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/18/2006
Control Number
2006-265
Agenda Item Number
11.I.1.
Entity Name
Timothy Rose Contracting
Subject
Roadway improvements to SR A1A and CR 510
Project Number
9701
Bid Number
2006079
Supplemental fields
SmeadsoftID
5753
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> Db. all materials with respect to intended use, incident thereto. The review and approval of a <br /> fabrication, shipping, handling, storage, assem- separate item as such will not indicate approval of <br /> bly, and installation pertaining to the perfor- the assembly in which the item functions. <br /> mance of the Work; <br /> 3. ENGINEER's review and approval of <br /> c. all information relative to means, meth- Shop Drawings or Samples shall not relieve CON- <br /> ods, techniques, sequences, and procedures of TRACTOR from responsibility for any variation <br /> construction and safety precautions and from the requirements of the Contract Documents <br /> programs incident thereto; and unless CONTRACTOR has in writing called <br /> ENGINEER' s attention to each such variation at the <br /> d. CONTRACTOR shall also have time of each submittal as required by paragraph <br /> reviewed and coordinated each Shop Drawing or 6. 17 .D.3 and ENGINEER has given written <br /> Sample with other Shop Drawings and Samples approval of each such variation by specific written <br /> and with the requirements of the Work and the notation thereof incorporated in or accompanying <br /> Contract Documents. the Shop Drawing or Sample approval; nor will any <br /> approval by ENGINEER relieve CONTRACTOR <br /> 2. Each submittal shall bear a stamp or from responsibility for complying with the require- <br /> specific written indication that CONTRACTOR has ments of paragraph 6. 17.D. 1 . <br /> satisfied CONTRACTOR's obligations under the <br /> Contract Documents with respect to F. Resubmittal Procedures <br /> CONTRACTOR' s review and approval of that <br /> submittal. 1 . CONTRACTOR shall make corrections <br /> required by ENGINEER and shall return the <br /> 3 . At the time of each submittal, CON- required number of corrected copies of Shop <br /> TRACTOR shall give ENGINEER specific written Drawings and submit as required new Samples for <br /> notice of such variations, if any, that the Shop Draw- review and approval. CONTRACTOR shall direct <br /> mg or Sample submitted may have from the require- specific attention in writing to revisions other than <br /> ments of the Contract Documents, such notice to be the corrections called for by ENGINEER on previ- <br /> in a written communication separate from the ous submittals. <br /> submittal; and, in addition, shall cause a specific <br /> notation to be made on each Shop Drawing and New Paragraph 6.17.G has been added. See the <br /> Sample submitted to ENGINEER for review and Supplementary Conditions. <br /> approval of each such variation. <br /> 6. 18 Continuing the Work <br /> E. ENGINEER 's Review <br /> A. CONTRACTOR shall carry on the Work and <br /> 1 . ENGINEER will timely review and adhere to the progress schedule during all disputes or <br /> approve Shop Drawings and Samples in accordance disagreements with OWNER. No Work shall be delayed or <br /> with the schedule of Shop Drawings and Sample postponed pending resolution of any disputes or <br /> submittals acceptable to ENGINEER. disagreements, except as permitted by paragraph 15 .04 or as <br /> ENGINEER' s review and approval will be only to OWNER and CONTRACTOR may otherwise agree in <br /> determine if the items covered by the submittals will, writing. <br /> after installation or incorporation in the Work, con- <br /> form to the information given in the Contract Docu- 6. 19 CONTRACTOR 's General Warranty and <br /> ments and be compatible with the design concept of Guarantee <br /> the completed Project as a functioning whole as <br /> indicated by the Contract Documents. - A. CONTRACTOR warrants and guarantees to <br /> OWNER, ENGINEER, and ENGINEER's Consultants that <br /> 2. ENGINEER' s review and approval will all Work will be in accordance with the Contract Docu- <br /> not extend to means, methods, techniques, ments and will not be defective. CONTRACTOR' s <br /> sequences, or procedures of construction (except warranty and guarantee hereunder excludes defects or <br /> J where a particular means, method, technique, damage caused by: <br /> sequence, or procedure of construction is <br /> specifically and expressly called for by the Contract 1 . abuse, modification, or improper main- <br /> Documents) or to safety precautions or programs tenance or operation by persons other than CON- <br /> 00700 - 26 <br /> ON-00700 - 26 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.