Laserfiche WebLink
The acceptance by the CONTRACTOR of final payment shall be and shall operate as a <br /> release to the OWNER from all claims and all liability to the CONTRACTOR other than <br /> claims in stated amounts as may be specifically excepted by the CONTRACTOR for all <br /> things done or furnished in connection with the work under this Contract and for every <br /> act and neglect of the OWNER and others relating to or arising out of the work. Any <br /> payment , however, final or otherwise , shall not release the CONTRACTOR or its <br /> sureties from any obligations under the Contract Documents or the Payment and <br /> Performance Bonds . <br /> ARTICLE 7 - INDEMNIFICATION <br /> 7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with <br /> paragraph 6.20 ( Indemnification) of the General Conditions to the Construction Contract. <br /> l ARTICLE 8 - CONTRACTOR 'S REPRESENTATIONS <br /> J 8 . 01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br /> following representations: <br /> A. CONTRACTOR has examined and carefully studied the Contract Documents and the <br /> other related data identified in the Bidding Documents . <br /> B . CONTRACTOR has visited the Site and become familiar with and is satisfied as to the <br /> general , local , and Site conditions that may affect cost, progress , and performance of the <br /> Work. <br /> C . CONTRACTOR is familiar with and is satisfied as to all federal , state , and local Laws and <br /> Regulations that may affect cost, progress, and performance of the Work. <br /> D. CONTRACTOR has carefully studied all : ( 1 ) reports of explorations and tests of <br /> subsurface conditions at or contiguous to the Site and all drawings of physical conditions <br /> in or relating to existing surface or subsurface structures at or contiguous to the Site <br /> (except Underground Facilities) which have been identified in the Supplementary <br /> Conditions as provided in paragraph 4.02 of the General Conditions and (2) reports and <br /> drawings of a Hazardous Environmental Condition , if any, at the Site which have been <br /> identified in the Supplementary Conditions as provided in paragraph 4.06 of the General <br /> 1 Conditions. <br /> J E . CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br /> J done so) all examinations, investigations, explorations, tests, studies, and data concerning <br /> conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site <br /> which may affect cost, progress, or performance of the Work or which relate to any aspect <br /> of the means, methods, techniques , sequences, and procedures of construction to be <br /> employed by CONTRACTOR , including applying the specific means , methods , <br /> techniques, sequences, and procedures of construction, if any, expressly required by the <br /> J Contract Documents to be employed by CONTRACTOR, and safety precautions and <br /> programs incident thereto <br /> F. CONTRACTOR does not consider that any further examinations, investigations , <br /> explorations, tests, studies, or data are necessary for the performance of the Work at the <br /> Contract Price, within the Contract Times, and in accordance with the other terms and <br /> 1 conditions of the Contract Documents . <br /> J <br /> 00520 - Agreement (Public Works) 2006079 <br /> l <br /> 00520 - 5 <br /> !II C'WnzippecNBID DOCUMENTS 2006079\13ID DOCUMENTS 2006079\00520 - Agreement (Public Works) 2006079.doc Rev. 05/01 <br />