My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-265
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:13:18 AM
Creation date
9/30/2015 9:53:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/18/2006
Control Number
2006-265
Agenda Item Number
11.I.1.
Entity Name
Timothy Rose Contracting
Subject
Roadway improvements to SR A1A and CR 510
Project Number
9701
Bid Number
2006079
Supplemental fields
SmeadsoftID
5753
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The acceptance by the CONTRACTOR of final payment shall be and shall operate as a <br /> release to the OWNER from all claims and all liability to the CONTRACTOR other than <br /> claims in stated amounts as may be specifically excepted by the CONTRACTOR for all <br /> things done or furnished in connection with the work under this Contract and for every <br /> act and neglect of the OWNER and others relating to or arising out of the work. Any <br /> payment , however, final or otherwise , shall not release the CONTRACTOR or its <br /> sureties from any obligations under the Contract Documents or the Payment and <br /> Performance Bonds . <br /> ARTICLE 7 - INDEMNIFICATION <br /> 7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with <br /> paragraph 6.20 ( Indemnification) of the General Conditions to the Construction Contract. <br /> l ARTICLE 8 - CONTRACTOR 'S REPRESENTATIONS <br /> J 8 . 01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br /> following representations: <br /> A. CONTRACTOR has examined and carefully studied the Contract Documents and the <br /> other related data identified in the Bidding Documents . <br /> B . CONTRACTOR has visited the Site and become familiar with and is satisfied as to the <br /> general , local , and Site conditions that may affect cost, progress , and performance of the <br /> Work. <br /> C . CONTRACTOR is familiar with and is satisfied as to all federal , state , and local Laws and <br /> Regulations that may affect cost, progress, and performance of the Work. <br /> D. CONTRACTOR has carefully studied all : ( 1 ) reports of explorations and tests of <br /> subsurface conditions at or contiguous to the Site and all drawings of physical conditions <br /> in or relating to existing surface or subsurface structures at or contiguous to the Site <br /> (except Underground Facilities) which have been identified in the Supplementary <br /> Conditions as provided in paragraph 4.02 of the General Conditions and (2) reports and <br /> drawings of a Hazardous Environmental Condition , if any, at the Site which have been <br /> identified in the Supplementary Conditions as provided in paragraph 4.06 of the General <br /> 1 Conditions. <br /> J E . CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br /> J done so) all examinations, investigations, explorations, tests, studies, and data concerning <br /> conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site <br /> which may affect cost, progress, or performance of the Work or which relate to any aspect <br /> of the means, methods, techniques , sequences, and procedures of construction to be <br /> employed by CONTRACTOR , including applying the specific means , methods , <br /> techniques, sequences, and procedures of construction, if any, expressly required by the <br /> J Contract Documents to be employed by CONTRACTOR, and safety precautions and <br /> programs incident thereto <br /> F. CONTRACTOR does not consider that any further examinations, investigations , <br /> explorations, tests, studies, or data are necessary for the performance of the Work at the <br /> Contract Price, within the Contract Times, and in accordance with the other terms and <br /> 1 conditions of the Contract Documents . <br /> J <br /> 00520 - Agreement (Public Works) 2006079 <br /> l <br /> 00520 - 5 <br /> !II C'WnzippecNBID DOCUMENTS 2006079\13ID DOCUMENTS 2006079\00520 - Agreement (Public Works) 2006079.doc Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.