2008-353 A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-353 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 10:55:43 AM
Creation date
10/1/2015 12:47:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
11/04/2008
Control Number
2008-353A
Agenda Item Number
8.U.
Entity Name
Timothy Rose Contracting
Subject
12th. Street sidewalk
Area
16th Ave. to 11th. Place
Project Number
0216
Bid Number
2008081
Supplemental fields
SmeadsoftID
7690
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 . 06 Final Inspection <br /> A. Upon written notice from CONTRACTOR that B . Review of Application and Acceptance <br /> the entire Work or an agreed portion thereof is 1 . If, on the basis of ENGINEER's <br /> complete , ENGINEER will promptly make a final observation of the Work during construction <br /> inspection with OWNER and CONTRACTOR and will and final inspection , and ENGINEER's review <br /> notify CONTRACTOR in writing of all particulars in of the final Application for Payment and <br /> which this inspection reveals that the Work is accompanying documentation as required by <br /> incomplete or defective . CONTRACTOR shall the Contract Documents , ENGINEER is <br /> immediately take such measures as are necessary to satisfied that the Work has been completed <br /> complete such Work or remedy such deficiencies . and CONTRACTOR's other obligations under <br /> the Contract Documents have been fulfilled , <br /> 14 . 07 Final Payment ENGINEER will , within ten days after receipt of <br /> the final Application for Payment, indicate in <br /> A. Application for Payment writing ENGINEER's recommendation of <br /> payment and present the Application for <br /> 1 . After CONTRACTOR has , in the Payment to OWNER for payment. At the same <br /> opinion of ENGINEER, satisfactorily completed time ENGINEER will also give written notice to <br /> all corrections identified during the final OWNER and CONTRACTOR that the Work is <br /> inspection and has delivered , in accordance acceptable subject to the provisions of <br /> with the Contract Documents , all maintenance paragraph 14 . 09 . Otherwise, ENGINEER will <br /> and operating instructions , schedules, guaran- return the Application for Payment to <br /> tees , Bonds , certificates or other evidence of CONTRACTOR, indicating in writing the <br /> insurance certificates of inspection , marked-up reasons for refusing to recommend final <br /> record documents (as provided in paragraph payment, in which case CONTRACTOR shall <br /> 6 . 12 ) , and other documents , CONTRACTOR make the necessary corrections and resubmit <br /> may make application for final payment follow- the Application for Payment. <br /> ing the procedure for progress payments . <br /> 2 . The final Application for Payment C . Payment Becomes Due <br /> shall be accompanied (except as previously <br /> delivered ) by: (i) all documentation called for in <br /> the Contract Documents , including but not aGGOMpaRyiRg dOGUMISIRtatiGA , <br /> limited to the evidence of insurance required by <br /> subparagraph 5 .04 . 13 . 7 ; (ii ) consent of the and , when due , well be paid by OWNER in <br /> surety, if any, to final payment; and (iii) . <br /> complete and legally effective releases or <br /> waivers (satisfactory to OWNER) of all Lien 14 . 08 Final Completion Delayed <br /> rights arising out of or Liens filed in connection <br /> with the Work. A. If, through no fault of CONTRACTOR, final <br /> completion of the Work is significantly delayed , and if <br /> 3 . In lieu of the releases or waivers of ENGINEER so confirms , OWNER shall , upon receipt <br /> Liens specified in paragraph 14 . 07 .A.2 and as of CONTRACTOR's final Application for Payment and <br /> approved by OWNER, CONTRACTOR may recommendation of ENGINEER, and without terminat- <br /> furnish receipts or releases in full and an ing the Agreement, make payment of the balance due <br /> affidavit of CONTRACTOR that: (i ) the releases for that portion of the Work fully completed and <br /> and receipts include all labor, services , accepted . If the remaining balance to be held by <br /> material , and equipment for which a Lien could OWNER for Work not fully completed or corrected is <br /> be filed ; and (ii) all payrolls , material and less than the retainage stipulated in the Agreement, <br /> equipment bills , and other indebtedness and if Bonds have been furnished as required in <br /> connected with the Work for which OWNER or paragraph 5 .01 , the written consent of the surety to <br /> OWNER's property might in any way be the payment of the balance due for that portion of the <br /> responsible have been paid or otherwise satis- Work fully completed and accepted shall be submitted <br /> fied . If any Subcontractor or Supplier fails to by CONTRACTOR to ENGINEER with the Application <br /> furnish such a release or receipt in full , CON - for such payment. Such payment shall be made <br /> TRACTOR may furnish a Bond or other under the terms and conditions governing final <br /> collateral satisfactory to OWNER to indemnify payment, except that it shall not constitute a waiver of <br /> OWNER against any Lien . Claims . <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 42 <br /> F:\Engineering\Capital Projects\0216-12th Street Between 16th Avenue and 11th Place\0216 Bid Documents\00700 - General Conditions REV 04-07.doc <br />