My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-353 A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-353 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 10:55:43 AM
Creation date
10/1/2015 12:47:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
11/04/2008
Control Number
2008-353A
Agenda Item Number
8.U.
Entity Name
Timothy Rose Contracting
Subject
12th. Street sidewalk
Area
16th Ave. to 11th. Place
Project Number
0216
Bid Number
2008081
Supplemental fields
SmeadsoftID
7690
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
thereby; however, CONTRACTOR shall not be liable 2 .07 Initial Acceptance of Schedules <br /> to OWNER or ENGINEER for failure to report any <br /> conflict, error, ambiguity, or discrepancy in the A. Unless otherwise provided in the Contract <br /> Contract Documents unless CONTRACTOR knew or Documents , at least ten days before submission of the <br /> reasonably should have known thereof. first Application for Payment a conference attended by <br /> CONTRACTOR, ENGINEER, and others as appropri- <br /> B . Preliminary Schedules: Within ten days after ate will be held to review for acceptability to ENGI - <br /> the Effective Date of the Agreement (unless otherwise NEER as provided below the schedules submitted in <br /> specified in the General Requirements) , CONTRAC- accordance with paragraph 2 . 05 . 6 . CONTRACTOR <br /> TOR shall submit to ENGINEER for its timely review: shall have an additional ten days to make corrections <br /> and adjustments and to complete and resubmit the <br /> 1 . a preliminary progress schedule schedules . No progress payment shall be made to <br /> indicating the times (numbers of days or dates) CONTRACTOR until acceptable schedules are <br /> for starting and completing the various stages submitted to ENGINEER. <br /> of the Work, including any Milestones specified 1 The progress schedule will be <br /> in the Contract Documents ; <br /> acceptable to ENGINEER if it provides an <br /> 2 , a preliminary schedule of Shop orderly progression of the Work to completion <br /> Drawing and Sample submittals which will list within any specified Milestones and the <br /> each required submittal and the times for sub- Contract Times . Such acceptance will not <br /> mitting , reviewing , and processing such impose on ENGINEER responsibility for the <br /> submittal ; and progress schedule, for sequencing , scheduling , <br /> or progress of the Work nor interfere with or <br /> 3 , a preliminary schedule of values for relieve CONTRACTOR from CONTRACTOR's <br /> all of the Work which includes quantities and full responsibility therefor. <br /> prices of items which when added together 2 CONTRACTOR's schedule of Shop <br /> equal the Contract Price and subdivides the <br /> Work into component parts in sufficient detail to Drawing and Sample submittals will be <br /> serve as the basis for progress payments acceptable to ENGINEER if it provides a <br /> during performance of the Work . Such prices workable arrangement for reviewing and <br /> will include an appropriate amount of overhead processing the required submittals . <br /> and profit applicable to each item of Work. <br /> 3 . CONTRACTOR's schedule of values <br /> I la will be acceptable to ENGINEER as to form <br /> of the Site is started , CONTRACTOR and OWNE all and substance if it provides a reasonable <br /> each deliver to the other , with copi o each allocation of the Contract Price to component <br /> additional insured identified int upplementary parts of the Work . <br /> Conditions , certificates of urance (and other ARTICLE 3 - CONTRACT DOCUMENTS : INTENT , <br /> evidence of insuranc ich either of them or any AMENDING , REUSE <br /> additional insur may reasonably request) which <br /> CONTRA and OWNER respectively are <br /> d-a- RG8 With 3 . 01 Intent <br /> A. The Contract Documents are comple- <br /> 2 .06 Preconstruction Conference mentary; what is called for by one is as binding as if <br /> called for by all . <br /> to run , but before an7yC=ONTRACTOR,, <br /> i e is started , a B . It is the intent of the Contract Documents to <br /> conference ENGINEER, describe a functionally complete Project (or part there- <br /> o ers as appropriate will be held o establish a of) to be constructed in accordance with the Contract <br /> Documents . Any labor, documentation , services , <br /> materials , or equipment that may reasonably be <br /> inferred from the Contract Documents or from <br /> qFaph ' prevailing custom or trade usage as being required to <br /> produce the intended result will be provided whether <br /> Payment, or not specifically called for at no additional cost to <br /> OWNER. <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 9 <br /> F:\Engineering\Capital Projects\0216-12th Street Between 16th Avenue and 11th Place\0216 Bid Documents\00700 - General Conditions REV 04-07 .doc <br />