My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-353B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-353B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 10:58:11 AM
Creation date
10/1/2015 12:48:24 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-353B
Agenda Item Number
8.U.
Entity Name
Timothy Rose Contracting
Subject
12th St. Sidewalk
Area
16th Avenue to 11th Place
Project Number
0216
Bid Number
2008081
Supplemental fields
SmeadsoftID
7691
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01050 <br /> FIELD ENGINEERING AND LAYOUT <br /> 1 . 1 GENERAL <br /> A . The CONTRACTOR will furnish all construction staking for the project . All <br /> staking from control will be under the supervision of a Florida Registered Land <br /> Surveyor. <br /> B . Develop and make all detail surveys and measurements needed for <br /> construction including but not limited to , slope stakes , batter boards , piling <br /> layouts and all other working lines , elevations and cut sheets . <br /> C . Keep a transit and leveling instrument on the site at all times and a skilled <br /> instrument man available whenever necessary for layout of the Work. <br /> D . Provide all material required for benchmarks , control points , batter boards , <br /> grade stakes , and other items . <br /> E . Be solely responsible for all locations , dimensions and levels . No data other <br /> than written orders of the ENGINEER shall justify departure from the <br /> dimensions and levels required by the Drawings . <br /> F . Safeguard all points , stakes , grademarks , monuments and benchmarks made <br /> or established on the Work , and reestablish same , if disturbed . Rectify all <br /> Work improperly installed because of not maintaining , not protecting or <br /> removing without authorization such established points , stakes , marks and <br /> monuments . <br /> G . When requested by the ENGINEER , provide such facilities and assistance as <br /> may be necessary for the ENGINEER to check line and grade points placed by <br /> the CONTRACTOR . Do no excavation or embankment work until all <br /> cross-sectioning necessary for determining pay quantities has been completed <br /> and checked by the ENGINEER . <br /> H . The cost of performing engineering and layout work described above shall be <br /> included in the contract unit prices for the various items of work to which it is <br /> incidental . No separate payment will be made for surveying or engineering . <br /> 1 . 2 SURVEY WORK AND QUALIFICATIONS OF SURVEYOR <br /> A . Prior to commencing work , the CONTRACTOR shall satisfy himself as to the <br /> accuracy of all survey and existing site information as indicated in the Contract <br /> Documents . Immediately notify the ENGINEER upon discovery of any errors , <br /> inaccuracies or omissions in the survey data . The commencing of any of the <br /> work by the CONTRACTOR shall be held as the CONTRACTOR' s acceptance <br /> that all survey or existing site information is correct and accurate , without any <br /> reasonably inferable errors , inaccuracies or omissions . <br /> 1050- 1 01050 Field Engineering <br /> F:\Engineering\Capital Projects\0216-12th Street Between 16th Avenue and 11th Place\0216 Bid Documents\01050 - Field Engineering.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.