Laserfiche WebLink
operates in a functional manner . Contractor shall remove silt and other material <br /> from sewer at no cost to Owner. Compensation shall be included in the <br /> maintenance of traffic lump sum item . <br /> SECTION 00443 FRENCH DRAINS <br /> A . Subarticle 443-7 is replaced by the following : <br /> The quantities determined as provided above will be paid for at the Contract unit <br /> price per foot for Concrete Slotted Culvert w/ Gravel Bedding (54" SS) , HDPE <br /> Perforated Culvert w/ Gravel Bedding (48 " SS) , HDPE Perforated Culvert w/ <br /> Gravel Bedding (54" SS) and Concrete Slotted Culvert w/ Exfiltration Trench (34" x <br /> 53 ") . Such prices and payments will be full compensation for all the work specified <br /> in this Section and will include all materials and all excavation , the disposal of <br /> surplus material , backfilling and tamping , but will not include payment for items <br /> paid for elsewhere in the specifications . <br /> SECTION 550 FENCING <br /> A . Subarticle 550-3 . 5 is modified by the following addition : <br /> All 6 ' Type B chain link fencing , posts , and gates , associated with stormwater <br /> management facility Pond 500 , shall have a green vinyl coating . The vinyl coating <br /> shall be no less than 20 mils thick on the fencing fabric and 10 mils thick on the <br /> post . The cost of the vinyl coating shall be included in the cost of the fence . <br /> B . Subarticle 550-6 . 1 is modified by the following : <br /> "The Contract unit price per foot for the Item of Fencing , measured as specified in <br /> 550-5 . 2 , will be full compensation for all work and materials necessary for the <br /> complete installation , including line posts , corner post, end posts and pull posts <br /> and the assemblies therefore , as provided below , and not including the payment <br /> stipulated for extra length posts . " <br /> SECTION 00575 SODDING <br /> A . Description : Sod for the project shall be of the variety that is common to the area <br /> and of a variety approved by the Engineer. This work shall also include mowing in <br /> GENERAL PROVISIONS <br /> 01025-13 <br /> F :\Engineering\Capital Projects\0216- 12th Street Between 16th Avenue and 11 th Place\0216 Bid Documents\DIVISION 2 - Technical <br /> Provisions. doc <br />