My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-353C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-353C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 11:00:02 AM
Creation date
10/1/2015 12:48:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-353C
Agenda Item Number
8.U.
Entity Name
Timothy Rose Contracting
Subject
12th. Street sidewalk
Area
16th Avenue to 11th Place
Project Number
0216
Bid Number
2008081
Supplemental fields
SmeadsoftID
7692
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
operates in a functional manner . Contractor shall remove silt and other material <br /> from sewer at no cost to Owner. Compensation shall be included in the <br /> maintenance of traffic lump sum item . <br /> SECTION 00443 FRENCH DRAINS <br /> A . Subarticle 443-7 is replaced by the following : <br /> The quantities determined as provided above will be paid for at the Contract unit <br /> price per foot for Concrete Slotted Culvert w/ Gravel Bedding (54" SS) , HDPE <br /> Perforated Culvert w/ Gravel Bedding (48 " SS) , HDPE Perforated Culvert w/ <br /> Gravel Bedding (54" SS) and Concrete Slotted Culvert w/ Exfiltration Trench (34" x <br /> 53 ") . Such prices and payments will be full compensation for all the work specified <br /> in this Section and will include all materials and all excavation , the disposal of <br /> surplus material , backfilling and tamping , but will not include payment for items <br /> paid for elsewhere in the specifications . <br /> SECTION 550 FENCING <br /> A . Subarticle 550-3 . 5 is modified by the following addition : <br /> All 6 ' Type B chain link fencing , posts , and gates , associated with stormwater <br /> management facility Pond 500 , shall have a green vinyl coating . The vinyl coating <br /> shall be no less than 20 mils thick on the fencing fabric and 10 mils thick on the <br /> post . The cost of the vinyl coating shall be included in the cost of the fence . <br /> B . Subarticle 550-6 . 1 is modified by the following : <br /> "The Contract unit price per foot for the Item of Fencing , measured as specified in <br /> 550-5 . 2 , will be full compensation for all work and materials necessary for the <br /> complete installation , including line posts , corner post, end posts and pull posts <br /> and the assemblies therefore , as provided below , and not including the payment <br /> stipulated for extra length posts . " <br /> SECTION 00575 SODDING <br /> A . Description : Sod for the project shall be of the variety that is common to the area <br /> and of a variety approved by the Engineer. This work shall also include mowing in <br /> GENERAL PROVISIONS <br /> 01025-13 <br /> F :\Engineering\Capital Projects\0216- 12th Street Between 16th Avenue and 11 th Place\0216 Bid Documents\DIVISION 2 - Technical <br /> Provisions. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.