Laserfiche WebLink
J� <br />St..Johns River <br />�. Water Management District <br />Kirby 8. Green III, Executive Director • David W. Fisk, Assistant Executive Director <br />4049 Reid Street • P.O. Box 1429 • Palatka, FL 32178-1429 • (386) 329-4500 <br />On the Internet at www.sjrwmd.com: <br />REGULATION OF STORMWATER MANAGEMENT SYSTEMS <br />CHAPTER 40C-425 F.A.C. <br />PERMIT NO.42-061-111760-2 DATE ISSUED: July 12, 2007 <br />A PERMIT AUTHORIZING: <br />Construction of a Stormwater Management System with stormwater treatment by best <br />management practices and swales with ditch blocks for 12th Street Sidewalk Improvements <br />from 16th Ave to 11th Ave, a 2.58 -acre project to be constructed as per plans received by the <br />District on June 13, 2007, <br />LOCATION: <br />Section(s): 11 Township(s): 33S <br />Indian River County <br />Indian River County Board of County Commissioners <br />1840 25th Street <br />Vero Beach, FL 32960 <br />Range(s): 39 b[Ig[JOW[Eff <br />JUL 16 2W7; <br />INDIAN DIVER COUNTY <br />ENGINEERING DIViStOfi <br />This document shall serve as the formal permit for construction and operation of stormwater <br />management system in accordance with Chapter 40C-42, F.A.C., issued by the staff of the St. <br />Johns River Water Management District on July 12, 2007. This permit is subject to the standard <br />limiting conditions and other special conditions approved by the staff. These conditions are <br />enclosed. <br />This permit is a legal document and should be kept with your other important records. The <br />permit requires the submittal of an As -built certification and may require submittal of other <br />documents. All information provided in compliance with permit conditions should be submitted <br />to the District office from which the permit was issued. An As -built certification form is attached. <br />Complete this form within 30 days of completion of construction of the permitted system, <br />including all site work. <br />Upon receipt of the As -built certification, staff will inspect the project site. Once the project is <br />found to be in compliance with all permit requirements, the permit may be converted to its <br />operation phase and responsibility transferred to the operation and maintenance entity in <br />accordance with Chapter 40C42.028, F.A.C. <br />GOVERNING BOARD <br />David G. Graham, CHAIRMAN John G. Sowinski, VICE CHAIRMAN Ann T. Moore, SECRETARY Duane L Ottenstroer, TREASURER <br />JACKSONVILLE ORLANDO BUNNELL JACKSONVILLE <br />R. Clay Albright Susan N. Hughes William W. Kerr Ometrias D. Long W. Leonard Wood <br />OCALA - PONTE VEORA MFLBnI IRNF RFACH AanpwA ccaNAhinwh acaru <br />