Laserfiche WebLink
J� St . . Johns River <br /> � . Water Management District <br /> Kirby 8. Green III, Executive Director • David W. Fisk, Assistant Executive Director <br /> 4049 Reid Street • P.O. Box 1429 • Palatka, FL 32178-1429 • (386) 329-4500 <br /> On the Internet at www. sjrwmd. com: <br /> REGULATION OF STORMWATER MANAGEMENT SYSTEMS <br /> CHAPTER 40C -425 F .A. C . <br /> PERMIT NO . 42-061 - 111760-2 DATE ISSUED : July 12 , 2007 <br /> A PERMIT AUTHORIZING : <br /> Construction of a Stormwater Management System with stormwater treatment by best <br /> management practices and swales with ditch blocks for 12th Street Sidewalk Improvements <br /> from 16th Ave to 11th Ave , a 2 . 58-acre project to be constructed as per plans received by the <br /> District on June 13 , 2007 , <br /> LOCATION : <br /> Section ( s ) : 11 Township( s ) : 33S Range( s ) : 39 N7 r <br /> o L V � U <br /> Indian River County <br /> JUL 16 2W7 ; <br /> Indian River County Board of County Commissioners <br /> 1840 25th Street INDIAN RIVER COUNTY <br /> Vero Beach , FL 32960 ENGINEERING DIViStOfi <br /> This document shall serve as the formal permit for construction and operation of stormwater <br /> management system in accordance with Chapter 40C-42 , F . A. C . , issued by the staff of the St. <br /> Johns River Water Management District on July 12 , 2007 . This permit is subject to the standard <br /> limiting conditions and other special conditions approved by the staff. These conditions are <br /> enclosed . <br /> This permit is a legal document and should be kept with your other important records . The <br /> permit requires the submittal of an As-built certification and may require submittal of other <br /> documents . All information provided in compliance with permit conditions should be submitted <br /> to the District office from which the permit was issued . An As-built certification form is attached . <br /> Complete this form within 30 days of completion of construction of the permitted system , <br /> including all site work . <br /> Upon receipt of the As-built certification , staff will inspect the project site . Once the project is <br /> found to be in compliance with all permit requirements , the permit may be converted to its <br /> operation phase and responsibility transferred to the operation and maintenance entity in <br /> accordance with Chapter 40C42 . 028 , F .A. C . <br /> GOVERNING BOARD <br /> David G. Graham, CHAIRMAN John G. Sowinski, VICE CHAIRMAN Ann T. Moore, SECRETARY Duane L Ottenstroer, TREASURER <br /> JACKSONVILLE ORLANDO BUNNELL JACKSONVILLE <br /> R. Clay Albright Susan N . Hughes William W. Kerr Ometrias D. Long W. Leonard Wood <br /> OCALA - PONTE VEORA MFLBnI IRNF RFACH AanpwA ccaNAhinwh acaru <br />