Laserfiche WebLink
D . TRAFFIC CONTROL DEVICES WARNING DEVICES AND BARRIERS - <br /> INSTALLATION : The responsibility for installation and maintenance of adequate <br /> traffic control devices , warning devices and barriers , for the protection of the travel <br /> in public and workmen , as well as to safeguard the work area in general shall rest <br /> with the Contractor . Consideration shall be given to recommendations of the <br /> Engineer . The required traffic control devices , warning devices and barriers shall <br /> be erected by the Contractor prior to creation of any hazardous condition and in <br /> conjunction with any necessary re- routing of traffic. The Contractor shall <br /> immediately remove , turn or cover any devices or barriers which do not apply to <br /> existing conditions . All traffic control devices shall conform to MUTCD standards <br /> and shall be clean and relatively undamaged . Damaged devices diminishing <br /> legibility and recognition , during either night or day conditions , are not acceptable <br /> for use . <br /> E . NO WAIVER OF LIABILITY : The Contractor shall conduct his operations in such a <br /> manner that no undue hazard will result due to the requirements of this article , and <br /> the procedures and policies described therein shall in no way act as a waiver of <br /> any of the terms of the liability of the Contractor or his surety . <br /> F . Non -Compliance : Should the Owner or Engineer determine that traffic within the <br /> project is not being maintained in accordance with the approved traffic control plan <br /> or presents a public safety concern , the contractor shall have until the end of the <br /> working day , in which notification is given , to take action to modify the maintenance <br /> of traffic . Should the contractor fail to make such modification the Owner shall <br /> have the option to fine the Contractor $400 per day until remedied . <br /> G . Contractor' s Maintenance of Traffic Plan shall maintain two-way vehicular traffic on <br /> 12th Street at all times . Owner shall have option to fine the Contractor $ 1 , 000 . 00 <br /> per day for Maintenance of Traffic Plan non-compliance . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> A. Bid Item No . 102 - Maintenance of Traffic - Lump Sum <br /> SECTION 00104 EROSION AND WATER POLLUTION <br /> CONTROL <br /> 1 . 1 The Contractor shall install erosion and water pollution control methods in accordance <br /> with FDOT Index 100 , 102 , 103 and 104 , Standard Specifications Section 104 , and all <br /> permit requirements . The Contractor is responsible for meeting appropriate federal , <br /> state , and local regulations and water quality standards , such as turbidity . All <br /> disturbed areas will be replanted with approved vegetation cover (either final or <br /> GENERAL PROVISIONS <br /> 01025-5 <br /> F :\Engineedng\Capital Projects\0216-12th Street Between 16th Avenue and 11th Place\0216 Bid Documents\DIVISION 2 - Technical <br /> Provisions .doc <br />