My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-353D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-353D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 11:03:22 AM
Creation date
10/1/2015 12:48:57 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-353D
Agenda Item Number
8.U.
Entity Name
Timothy Rose Contracting
Subject
12th. Street sidewalk
Area
16th Ave. to 11th Place
Project Number
0216
Bid Number
2008081
Supplemental fields
SmeadsoftID
7693
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 . SUSPENSION AND DEBARMENT <br /> The bidder shall complete andsubmit <br /> nation as provided rov d d herein .h its bid ) the certification regaring The inability to prrovide theacertif cationebrment <br /> form will included <br /> in this package, or an explanation <br /> P <br /> necessarily result in denial of participation in the project. The bidder shall submit an explanation of why it <br /> cannot provide the requested certification , which will be considered in evaluation of the bidder's bid package . <br /> However , failure by a bidder to furnish a certification or an explanation shall disqualify such bidder from this <br /> project. <br /> ing its bid that should it be awarded the contract, it will not knowingly enter into <br /> The bidder agrees by submitt <br /> any sub-contracts for this project with a person who is debarred , suspended , declared ineligible or excluded <br /> from participation in this aansaction , The <br /> ll sub contractobidder further rs on the projegrees that it will require the same certification in all <br /> solicitations for and from <br /> The certification is a material representation of fact upon which the County will rely, if it is later determined <br /> that the bidder rendered an erroneous certification , or knowingly entered into a sub-contract with a <br /> subcontractor who is debarred , suspended or ineligible , the County may terminate the contract for cause of <br /> default. <br /> 28 . EQUIPMENT <br /> ( 1 ) Publicly Owned Equipment * The policy definition of publicly owned equipment is " . . <br /> equipment previously purchased or otherwise acquired by the public agency involved for use in its own <br /> operations. " the policy goes on to state that " . . . publicly owned equipment should not normally compete <br /> with privately owned equipment on a project to be let to contract. " <br /> (2) . Eguipment Rental Rates . Contractor shall comply with the cost principles and <br /> procedures set forth in 48 C . F . R. Part 31 . Reasonable costs of renting construction equipment are allowable ; <br /> but the allowability of charges of equipment rentals from any division , subsidiary of organization under <br /> common control of contractor will be determined in accordance with 48 C . F . R. Sec. 31 .205-36 (b)(3) . <br /> 29 . MATERIALS <br /> (1 ) Source of Supply' Convict Labor. Materials produced by convict labor are prohibited <br /> from use on this project unless specific written authority for such use is obtained from FDOT and : (i) such <br /> materials are produced by convicts on parole , supervised release , or probation from a prison . <br /> (2 ) No Local Preference . The contractor must furnish all materials to be incorporated in the <br /> work , and the contractor shall be permitted to select the sources from which the materials are to be obtained . <br /> The County shall not impose any requirement or enforce any procedure which operates to require the use of, <br /> or provides a price differential in favor of, articles or materials produced within the State . <br /> 30 . SALVAGE CREDITS . <br /> There will be no credit to the project as a result of salvaged materials or equipment. <br /> 31 . SUBCONTRACTING <br /> Prime Contractor Reauirement . The prime contractor shall perform at least 30 percent of <br /> ( 1 ) tage shall be of the original contract price , exclusive of <br /> contract work with its own organization . This percen <br /> specialty items , but include the cost of materials and manufactured products purchased or produced by the <br /> prime contractor . <br /> (2 ) Subcontract approval . No portion of the work may be sublet, assigned , or otherwise <br /> subcontracted without the written consent of the County. Subcontract approval shall be based on satisfactory <br /> evidence that each subcontract is in writing and contains all the pertinent provisions . The approval of a <br /> subcontract does not relieve the contractor of responsibility for fulfillment of the contract . 25 <br /> E\Engineering\Capital Projects\0216- 12th Street Between 16th Avenue and 11th Place\0216 Federal Contract <br /> Plovisions . doc 8/29/2008 306:25 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.