Laserfiche WebLink
GENERAL CONDITIONS AND TERMS <br /> Section Ca tion <br /> GC 1 Definitions <br /> orrelation and Intent <br /> GC 2 Execution , C <br /> GC 3 Contractor Liable and Responsible to Owner <br /> GC 4 Engineer's Status <br /> GC 5 Design , Drawings and Specifications <br /> GC 6 Materials , Labor , Equipment <br /> GC 7 Permit and Fees <br /> GC 8 Project Manager <br /> GC 9 Subcontractors and Suppliers <br /> GC 10 Contractor Meetings <br /> GC 11 Scheduling <br /> GC 12 Schedule of Values <br /> GC 13 Land for Work <br /> GC 14 Survey, Lines and Grade <br /> GC 15 Site Conditions <br /> GC 16 Subsoil Conditions <br /> GC 17 Surface and Subsurface Water <br /> GC 18 Contractor Work Area <br /> GC 19 Contractor-Furnished Materials , Equipment and Workmanship <br /> GC 20 Protection of the Work and Property <br /> GC 21 Utilities <br /> GC 22 Delivery Unloading and Storage <br /> GC 23 Fire Protection <br /> GC 24 Illumination <br /> GC 25 Dust Control <br /> GC 26 Pollution Control <br /> GC 27 Explosives and Hazardous Materials <br /> GC 28 Labor <br /> GC 29 Safety <br /> GC 30 Progress <br /> GC 31 Inspection <br /> GC 32 Testing <br /> GC 33 Substitution <br /> GC 34 Correction of Defective Materials or Workmanship <br /> GC 35 Correction of Work <br /> GC 36 Owner' s Right to Correct or Complete Work <br /> GC 37 Changes in Work <br /> GC 38 Use of Completed Portions <br /> GC 39 Cleaning Up <br /> 27 <br /> F :\Engineering\Capital Projects\0216- 12th Street Between l6th Avenue and 1 lth Place\0216 Federal Contract <br /> Provisions.doc <br /> SI2aww 3:06:25 PM <br />