My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-353D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-353D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 11:03:22 AM
Creation date
10/1/2015 12:48:57 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-353D
Agenda Item Number
8.U.
Entity Name
Timothy Rose Contracting
Subject
12th. Street sidewalk
Area
16th Ave. to 11th Place
Project Number
0216
Bid Number
2008081
Supplemental fields
SmeadsoftID
7693
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
provide artificial light sufficient to permit work to be carried on satisfactorily and safely. <br /> GC 25 DUST CONTROL <br /> For the duration of the contract, the Contractor shall , at its expense , maintain all excavations , roads , <br /> plant sites , borrow areas and all other work areas free from dust. Code-required or industry-accepted <br /> methods of dust control suitable for the area involved and approved by Owner will be permitted . <br /> GC 26 POLLUTION CONTROL <br /> Contractor shall , at its expense , perform its work so as not to discharge into the atmosphere, any body <br /> of water, the ground or groundwater, from any source , smoke , dust or other contaminants in violation of the <br /> laws , rules and regulations of all federal , state and local air and water pollution requirements . Contractor shall , <br /> at its expense , provide suitable facilities to prevent any such discharges . Contractor shall immediately report <br /> to Owner and appropriate authorities any spill of contaminant. <br /> GC27 DEBRIS DISPOSAL <br /> All debris shall be legally disposed of at licensed disposal site (s ) . <br /> GC 27 EXPLOSIVES AND HAZARDOUS MATERIALS <br /> Contractor shall obtain all required federal , state and local permits and licenses and shall be <br /> responsible for the safe and proper handling , transportation , storage and use of any explosive or hazardous <br /> material brought onto or encountered with in the site . The Contractor will notify the Owner immediately if <br /> explosive or hazardous materials are encountered on the site . Contractor shall maintain and post as <br /> necessary, Material hazard Data Sheets for all applicable hazardous materials used in the course of the work. <br /> In the event that hazardous material is improperly handled or stored by the Contractor or its sub-contractors , <br /> which results in contamination of the site , Contractor shall immediately notify the Owner and the appropriate <br /> governmental authority and shall take whatever action is necessary or desirable to remediate the <br /> contamination at the Contractor's sole cost and expense . Contractor shall indemnify and hold harmless the <br /> Owner from any expense , action or liability resulting from such contamination and remedial actions . <br /> GC 28 LABOR <br /> Contractor shall employ only competent and skilled personnel to perform the work. Contractor shall , if <br /> requested by Owner, remove from the jobsite any personnel of Contractor who is determined by Owner to be <br /> unfit or working in violation of any provision of the Contract. Contractor and all subcontractors shall be bound <br /> by and comply with all applicable Federal , State and local laws regarding labor. All work performed after <br /> regular working hours , on Sundays or legal holidays , shall be performed without additional expense to the <br /> Owner. <br /> GC 29 SAFETY <br /> The Contractor shall be responsible for initiating , maintaining and supervising all safety precautions <br /> and programs in connection with the work . Contractor will provide to each worker on the job site the proper <br /> safety equipment for the duties being performed by the worker and will not permit any worker on the job site <br /> who fails or refuses to use the safety equipment. The Contractor shall provide and maintain all necessary <br /> watchmen , barricades , warning lights , and signs and take all necessary precautions for the protection of all <br /> persons involved in the work, the public, and all employees or representatives of Owner. All work and all <br /> equipment, machinery, materials and tools shall be in compliance with and conform to all applicable laws , <br /> ordinance, rules and regulations . <br /> GC 30 PROGRESS <br /> During construction , Contractor shall keep a marked -up and up-to-date set of drawings showing as- <br /> built conditions on that site as an accurate record of all deviations between work as shown and work as <br /> installed . These drawings shall be available to Owner and Engineer for inspection at any time . <br /> During construction , Contractor shall keep a marked -up and up-to date set of specifications showing <br /> as-is conditions on the site annotated to clearly indicate all substitutions or product selections that are <br /> incorporate into the work . These specifications shall be available to Owner and Engineer for inspection at any <br /> time . <br /> 36 <br /> F :\Engineering\Capital Projects\0216- 12th Street Between 16th Avenue and 11th Place\0216 Federal Contract <br /> Provisions . doc 8/29/2008 3:06:25 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.