Laserfiche WebLink
provide artificial light sufficient to permit work to be carried on satisfactorily and safely. <br /> GC 25 DUST CONTROL <br /> For the duration of the contract, the Contractor shall , at its expense , maintain all excavations , roads , <br /> plant sites , borrow areas and all other work areas free from dust. Code-required or industry-accepted <br /> methods of dust control suitable for the area involved and approved by Owner will be permitted . <br /> GC 26 POLLUTION CONTROL <br /> Contractor shall , at its expense , perform its work so as not to discharge into the atmosphere, any body <br /> of water, the ground or groundwater, from any source , smoke , dust or other contaminants in violation of the <br /> laws , rules and regulations of all federal , state and local air and water pollution requirements . Contractor shall , <br /> at its expense , provide suitable facilities to prevent any such discharges . Contractor shall immediately report <br /> to Owner and appropriate authorities any spill of contaminant. <br /> GC27 DEBRIS DISPOSAL <br /> All debris shall be legally disposed of at licensed disposal site (s ) . <br /> GC 27 EXPLOSIVES AND HAZARDOUS MATERIALS <br /> Contractor shall obtain all required federal , state and local permits and licenses and shall be <br /> responsible for the safe and proper handling , transportation , storage and use of any explosive or hazardous <br /> material brought onto or encountered with in the site . The Contractor will notify the Owner immediately if <br /> explosive or hazardous materials are encountered on the site . Contractor shall maintain and post as <br /> necessary, Material hazard Data Sheets for all applicable hazardous materials used in the course of the work. <br /> In the event that hazardous material is improperly handled or stored by the Contractor or its sub-contractors , <br /> which results in contamination of the site , Contractor shall immediately notify the Owner and the appropriate <br /> governmental authority and shall take whatever action is necessary or desirable to remediate the <br /> contamination at the Contractor's sole cost and expense . Contractor shall indemnify and hold harmless the <br /> Owner from any expense , action or liability resulting from such contamination and remedial actions . <br /> GC 28 LABOR <br /> Contractor shall employ only competent and skilled personnel to perform the work. Contractor shall , if <br /> requested by Owner, remove from the jobsite any personnel of Contractor who is determined by Owner to be <br /> unfit or working in violation of any provision of the Contract. Contractor and all subcontractors shall be bound <br /> by and comply with all applicable Federal , State and local laws regarding labor. All work performed after <br /> regular working hours , on Sundays or legal holidays , shall be performed without additional expense to the <br /> Owner. <br /> GC 29 SAFETY <br /> The Contractor shall be responsible for initiating , maintaining and supervising all safety precautions <br /> and programs in connection with the work . Contractor will provide to each worker on the job site the proper <br /> safety equipment for the duties being performed by the worker and will not permit any worker on the job site <br /> who fails or refuses to use the safety equipment. The Contractor shall provide and maintain all necessary <br /> watchmen , barricades , warning lights , and signs and take all necessary precautions for the protection of all <br /> persons involved in the work, the public, and all employees or representatives of Owner. All work and all <br /> equipment, machinery, materials and tools shall be in compliance with and conform to all applicable laws , <br /> ordinance, rules and regulations . <br /> GC 30 PROGRESS <br /> During construction , Contractor shall keep a marked -up and up-to-date set of drawings showing as- <br /> built conditions on that site as an accurate record of all deviations between work as shown and work as <br /> installed . These drawings shall be available to Owner and Engineer for inspection at any time . <br /> During construction , Contractor shall keep a marked -up and up-to date set of specifications showing <br /> as-is conditions on the site annotated to clearly indicate all substitutions or product selections that are <br /> incorporate into the work . These specifications shall be available to Owner and Engineer for inspection at any <br /> time . <br /> 36 <br /> F :\Engineering\Capital Projects\0216- 12th Street Between 16th Avenue and 11th Place\0216 Federal Contract <br /> Provisions . doc 8/29/2008 3:06:25 PM <br />