20 . PRE-BID SITE INSPECTION AND PRE -BID CONFERENCE <br /> SITE INSPECTION - NONE <br /> PRE-BID CONFERENCE - NONE <br /> 21 . TIME OF COMPLETION AND LIQUIDATED DAMAGES <br /> BASE BID — TIMEFRAME <br /> The work to be performed as part of the BASE BID project timeframe shall commence on the date of <br /> the written notice to proceed given by the County, which is anticipated to be issued on October 1 , <br /> 2008 . All work that is to be performed as part of this contract shall be substantially completed by <br /> November 30 , 2008 and totally 100 % completed by December 31 , 2008 , with such extensions of <br /> time in calendar days as are provided for in the General Terms and Conditions outlined below . <br /> If said work is not substantially completed within the specified timeframes listed above , the <br /> contractor shall be liable and hereby agrees to pay the owner as liquidated damages , and not as a <br /> penalty, the sum of $ 580 .00 dollars per calendar day between the date Substantial Completion of <br /> the work is achieved and the Final 100 % Completion date and or Acceptance by the County for <br /> each and every day or part of a day thereafter that said work remains incomplete . <br /> 22 . SPECIAL PROVISIONS <br /> The Contractor shall comply with the following special provisions as part of the contract for the 12th <br /> Street Sidewalk Improvements Project: <br /> ( 1 ) (A) BASE BID- TIMEFRAME <br /> The total time for the project construction will commence with a Written Notice to <br /> Proceed from the County that is anticipated to be issued to the Contractor on <br /> October , 2006 with the project being substantially completed by the Contractor on <br /> November 30 , 2008 and totally 100 % completed by the Contractor on December 31 , <br /> 2008 . <br /> (B ) CPM SCHEDULE AND NARRITIVE <br /> The Contractor shall submit to the County as part of his bid submission , a detailed <br /> construction schedule in CPM format outlining the proposed progress of the work to <br /> be performed by the Contractor and his subcontractors for the BASE BID — <br /> TIMEFRAME . <br /> The Contractors CPM schedule for the BASE BID — TIMEFRAME shall include but <br /> not be limited to the demolition phasing dates of the work, manufacturing dates of all <br /> components , all phasing dates of the total work required for each component to be <br /> manufactured and installed , the start and completion dates for each phase of the <br /> individual components to be installed , street closure dates and durations including <br /> the start and completion dates of each phase . <br /> 55 <br /> F :\Engineering\Capital Projects\0216- 12th Street Between 16th Avenue and 11th Place\0216 Federal Contract <br /> Provisions .doc a29rXW 3:6:25 PM <br />