My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-339
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-339
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2016 9:30:00 AM
Creation date
10/1/2015 12:44:06 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/21/2008
Control Number
2008-339
Agenda Item Number
8.G.
Entity Name
Timothy Rose Contracting
Subject
Modifications Pump Station
Lift Station No. 2058
Area
37th Street
Project Number
2784
Bid Number
2008063
Supplemental fields
SmeadsoftID
7651
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( o - LI � o8 <br /> SECTION 00530 - EJCDC <br /> STANDARD FORM OF AGREEMENT <br /> BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> i <br /> THIS AGREEMENT ("Agreement" or "Contract") , dated the /1 `day of 1 in the <br /> year 2008 by and between Indian River County, a political subdivision of the State of Florida <br /> (hereinafter called OWNER) and Timothy Rose Contracting , Inc. (hereinafter called <br /> CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth , agree <br /> as follows : <br /> ARTICLE 1 WORK <br /> CONTRACTOR as an independent contractor and not as an employee shall furnish and complete <br /> all of the necessary labor, material , and equipment to perform the work as specified or indicated in <br /> the Contract Documents. The work is generally described as follows: <br /> Upgrades and modifications to IRCDUS Lift Station No . 2058 , including : concrete <br /> flatwork , fence, landscaping , replacement of wet well , piping and hardware; <br /> replacement of valve vault; piping and hardware , conversion of existing wet well to a <br /> manhole ; removal of existing valve vault, piping , and fittings; construction of a <br /> sanitary sewer manhole and 8" and 12" gravity sewer; re-routing electric conduit and <br /> service ; remove and re-use/install existing ABS 25 HP pumps in new wet well ; <br /> construct connections, extensions and alterations to the adjacent sanitary sewer <br /> force main ; and maintain uninterrupted sewer service during the work. <br /> ARTICLE 2 ENGINEER <br /> The project has been designed by Schulke , Bittle & Stoddard , LLC , hereinafter called ENGINEER, <br /> and who is to act as OWNER'S representative, assume all duties and responsibilities and have the <br /> rights and authority assigned to ENGINEER in the Contract Documents in connection with <br /> completion of the work in accordance with the Contract Documents . <br /> ARTICLE 3 CONTRACT TIME <br /> 3. 1 The CONTRACTOR shall be substantially completed with the following timeframe <br /> (a ) Within 15 calendar days from effective date of Notice to Proceed , Contractor <br /> shall complete the following tasks : <br /> 1 . Obtain all necessary permits . <br /> 2 . Receive approved shop drawings for all materials and equipment to be <br /> utilized <br /> in the job . <br /> 3 . Perform all photographic recording and documentation of conditions prior <br /> to construction . <br /> 4 . Locate all existing utilities in the area of work . <br /> 5 . Submit and secure approval of shop drawings . <br /> 6 . Mobilize all labor, equipment , and materials . <br /> 00530- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.