Laserfiche WebLink
specifically excepted by the CONTRACTOR for all things done or furnished in <br />connection with the work under this contract and for every act and neglect of the <br />OWNER and others relating to or arising out of the work. Any payment, however, final or <br />otherwise, shall not release the CONTRACTOR or its sureties from any obligations <br />under the Contract Documents or the Payment and Performance Bonds. <br />ARTICLE 6 INTEREST <br />Not Applicable. <br />ARTICLE 7 CONTRACTOR'S REPRESENTATIONS <br />In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following <br />representations: <br />7.1 CONTRACTOR has familiarized itself with the nature and extent of the Contract <br />Documents, work, site, locality, and all local conditions and laws and regulations that in any <br />manner may affect cost, progress, performance or furnishing of the work. <br />7.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br />conditions and drawings of physical conditions which are identified in the Supplementary <br />Conditions as provided in Paragraph 4.02 of the General Conditions, and accepts the <br />determination set forth in Paragraph SC 4.02 of the Supplementary Conditions of the extent <br />of the technical data contained in such reports and drawings upon which CONTRACTOR is <br />entitled to rely. <br />7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining <br />and carefully studying) all such examinations, investigations, explorations, tests, reports and <br />studies (in addition to or to supplement those referred to in Paragraph 7.2 above) which <br />pertain to the subsurface or physical conditions at or contiguous to the site or otherwise may <br />affect the cost, progress, performance or furnishing of the work as CONTRACTOR <br />considers necessary for the performance of furnishing of the work at the Contract Price, <br />within the Contract Time and in accordance with the other terms and conditions of the <br />Contract Documents, including specifically the provisions of Paragraph 4.02 of the General <br />Conditions; and no additional examinations, investigations, explorations, tests, reports, <br />studies or similar information or data are or will be required by CONTRACTOR for such <br />purposes. <br />7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on <br />the Contract Documents with respect to existing underground facilities at or contiguous to <br />the site and assumes responsibility for the accurate location of said underground facilities. <br />No additional examinations, investigations, explorations, tests, reports, studies or similar <br />information or data in respect of said underground facilities are or will be required by <br />CONTRACTOR in order to perform and furnish the work at the Contract Price, within the <br />Contract Time and in accordance with the other terms and conditions of the Contract <br />Documents, including specifically the provisions of Paragraph 4.04 of the General <br />Conditions. <br />[1A191cIi31 <br />