My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-171
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2016 1:30:32 PM
Creation date
10/1/2015 3:38:21 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
06/09/2009
Control Number
2009-171
Agenda Item Number
12.J.1
Entity Name
Timothy Rose Contracting
Subject
Change Order No.1 Vero Lake Estates
Master Plan Water Phase II
Area
Vero Lake Estates
Project Number
2958
Supplemental fields
SmeadsoftID
10696
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vero Lake Estates <br /> Water Main Extension <br /> Phase Two <br /> Change Order 1 Exhibit <br /> Item Description Unit Qty Unit Cost Total Chg Cost <br /> 1 12 " Water Main LF - 1570 $ 23 . 00 $ ( 36 , 110 . 00 ) <br /> 2 12 " Directional Bore LF -580 $ 82 . 00 $ (47 , 560 . 00) <br /> 3 8" Directional Bore LF -80 $ 46 . 00 $ ( 31680 . 00 ) <br /> 4 12 " Gate Valve EA -2 $ 2 , 080 . 00 $ (4 , 160 . 00 ) <br /> 5 12"x12 " Wet Tap w/ 12 " Valve EA - 1 $ 4 , 600. 00 $ (4 , 600 . 00 ) <br /> 6 12 "x8" Wet Tap W/ 8 " Valve EA - 1 $ 29900 . 00 $ (2 , 900 . 00 ) <br /> 7 Fire Hydrant Assembly EA -2 $ 21630 . 00 $ ( 51260 . 00 ) <br /> 8 Air Release Valves EA -6 $ 3 , 838 . 00 $ (23 , 028 . 00 ) <br /> 9 S1 Asphalt Sq Yd 180 $ 17 . 40 $ 3 , 132 . 00 <br /> 10 Base Rock Sq Yd 180 $ 16 . 00 $ 21880 . 00 <br /> 11 lCompacted Sub-Grade Sq Yd 1 180 1 $ 6 . 50 $ 11170 . 00 <br /> 12 8 " Gate Valve EA 1 $ 11215 . 00 $ 1 , 215 . 00 <br /> Total Change Order Costs $ ( 118 , 901 . 00 ) <br /> The reduction of some of materials is due to Indian River County Road and Bridge having <br /> contracted Sheltra & Sons to perform the installation of the water main from 104th Avenue to 101st Avenue . <br /> This reduced the amount of construction Tim Rose Construction bid on . The air release valves were deleted <br /> at the request of Indian River County Utilities . <br /> The addition of roadway materials is due to directional bores being replaced by open cuts at four <br /> intersections at the request of Indian River County Utilities . <br /> The additional 8" gate valve replaced the 12"x8" wet tap w/ gate valve . <br /> /Ikb <br /> File : 0741 <br /> VLE Chg Odr Exhibit_021909 <br />
The URL can be used to link to this page
Your browser does not support the video tag.