ARTICLE 7 - INDEMNIFICATION
<br /> 7 .01 CONTRACTOR shall indemnify OWNER , ENGINEER , and others in accordance with
<br /> paragraph 6 . 20 (Indemnification) of the General Conditions to the Construction Contract.
<br /> ARTICLE 8 - CONTRACTOR ' S REPRESENTATIONS
<br /> 8 . 01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the
<br /> following representations :
<br /> A. CONTRACTOR has examined and carefully studied the Contract Documents and the
<br /> other related data identified in the Bidding Documents ,
<br /> Be CONTRACTOR has visited the Site and become familiar with and is satisfied as to the
<br /> general , local , and Site conditions that may affect cost, progress , and performance of the
<br /> Work.
<br /> C . CONTRACTOR is familiar with and is satisfied as to all federal , state , and local Laws and
<br /> Regulations that may affect cost, progress , and performance of the Work.
<br /> D . CONTRACTOR has carefully studied all : ( 1 ) reports of explorations and tests of
<br /> subsurface conditions at or contiguous to the Site and all drawings of physical conditions in
<br /> or relating to existing surface or subsurface structures at or contiguous to the Site (except
<br /> Underground Facilities) , if any, which have been identified in the Supplementary
<br /> Conditions as provided in paragraph 4 . 02 of the General Conditions and (2) reports and
<br /> drawings of a Hazardous Environmental Condition , if any, at the Site which have been
<br /> identified in the Supplementary Conditions as provided in paragraph 4 . 06 of the General
<br /> Conditions .
<br /> E . CONTRACTOR has obtained and carefully studied (or assumes responsibility for having
<br /> done so ) all additional or supplementary examinations , investigations , explorations , tests ,
<br /> studies , and data concerning conditions (surface , subsurface , and Underground Facilities )
<br /> at or contiguous to the Site which may affect cost, progress , or performance of the Work or
<br /> which relate to any aspect of the means , methods , techniques , sequences , and
<br /> procedures of construction to be employed by CONTRACTOR, including applying the
<br /> specific means , methods , techniques , sequences , and procedures of construction , if any ,
<br /> expressly required by the Contract Documents to be employed by CONTRACTOR , and
<br /> safety precautions and programs incident thereto
<br /> F . CONTRACTOR does not consider that any further examinations , investigations ,
<br /> explorations , tests , studies , or data are necessary for the performance of the Work at the
<br /> Contract Price , within the Contract Times , and in accordance with the other terms and
<br /> conditions of the Contract Documents ,
<br /> G . CONTRACTOR is aware of the general nature of work to be performed by OWNER and
<br /> others at the Site that relates to the Work as indicated in the Contract Documents .
<br /> H . CONTRACTOR has correlated the information known to CONTRACTOR, information and
<br /> observations obtained from visits to the Site , reports and drawings identified in the
<br /> Contract Documents, and all additional examinations , investigations , explorations, tests ,
<br /> studies , and data with the Contract Documents.
<br /> 00520 - Agreement (Public Works) REV 04-07.doc
<br /> 00520 - 5
<br /> FAEngineedng%Spedal Projects%Eagle Trace Phase Montnact DocumentslEagle Trace Subdkislon Phase inoomo . Agreement (Public Works) REV 04-07.doc