Laserfiche WebLink
ARTICLE 7 = INDEMNIFICATION <br /> 7 ..01 CONTRACTOR shall indemnify OWNER , ENGINEER, and others in accordance with <br /> paragraph 6 . 20 (Indemnification) of the General Conditions to the Construction Contract. <br /> ARTICLE 8 = CONTRACTOR' S REPRESENTATIONS <br /> 8 . 01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br /> following representations : <br /> A. CONTRACTOR has examined and carefully studied the Contract Documents and the <br /> other related data identified in the Bidding Documents . <br /> B . CONTRACTOR has visited the Site and become familiar with and is satisfied as to the <br /> general , local , and Site conditions that may affect cost, progress , and performance of the <br /> Work . <br /> Co CONTRACTOR is familiar with and is satisfied as to all federal , state , and local Laws and <br /> Regulations that may affect cost, progress , and performance of the Work . <br /> D . CONTRACTOR has carefully studied all : ( 1 ) reports of explorations and tests of <br /> subsurface conditions at or contiguous to the Site and all drawings of physical conditions in <br /> or relating to existing surface or subsurface structures at or contiguous to the Site (except <br /> Underground Facilities ) , if any, which have been identified in the Supplementary <br /> Conditions as provided in paragraph 4 . 02 of the General Conditions and (2 ) reports and <br /> drawings of a Hazardous Environmental Condition , if any, at the Site which have been <br /> identified in the Supplementary Conditions as provided in paragraph 4 . 06 of the General <br /> Conditions . <br /> E . CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br /> Ir . done so) all additional or supplementary examinations , investigations , explorations , tests , <br /> studies , and data concerning conditions (surface , subsurface , and Underground Facilities ) <br /> at or contiguous to the Site which may affect cost, progress , or performance of the Work or <br /> which relate to any aspect of the means , methods , techniques , sequences , and <br /> procedures of construction to be employed by CONTRACTOR , including applying the <br /> specific means , methods , techniques , sequences , and procedures of construction , if any , <br /> expressly required by the Contract Documents to be employed by CONTRACTOR , and <br /> safety precautions and programs incident thereto <br /> F . CONTRACTOR does not consider that any further examinations , investigations , <br /> explorations , tests , studies , or data are necessary for the performance of the Work at the <br /> Contract Price , within the Contract Times , and in accordance with the other terms and <br /> conditions of the Contract Documents . <br /> G . CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br /> others at the Site that relates to the Work as indicated in the Contract Documents . <br /> H . CONTRACTOR has correlated the information known to CONTRACTOR, information and <br /> observations obtained from visits to the Site , reports and drawings identified in the <br /> Contract Documents , and all additional examinations , investigations , explorations , tests , <br /> studies , and data with the Contract Documents . <br /> 00520 - Agreement (Public Works ) REV 04-07. doc <br /> 00520 - 5 <br /> F:\Enginsering\Special Projects\Eagle Trace Phase 2\Contract Documents\Eagle Trace Subdivision Phase II\00520 - Agreement (Public Works) REV 04-07.doc <br />