| arbitration	or       other       dispute       resolution	costs ) 											1   ,   		all     persons     on     the  	Site     or    who    may
<br />      										arising     out    of    or    relating    to    any    claim     or    action ,      								be   affected    by   the   Work ;
<br />      										legal     or     equitable ,      brought     by    any     such     owner
<br />      										or     occupant     against   OWNER,      ENGINEER ,      or											2 .    		all   the   Work   and    materials   and    equip-
<br />      										any      other      party      indemnified      hereunder      to      the     								ment       to       be       incorporated       therein ,       whether       in
<br />      										extent  		caused   		by		or  		based  		upon      								storage   on   or   off  the   Site ;    and
<br />      										CONTRACTOR' s    performance   of  the   Work .
<br />     																																																	3 .    		other     property    at    the    Site    or    adjacent
<br />   									B .  	Removal   of  Debris    During   Performance    of  the     								thereto ,      including     trees ,      shrubs ,      lawns ,     walks ,
<br />							Work: 	During     the     progress     of    the     Work     CONTRAC-     								pavements ,      roadways ,      structures ,     utilities ,     and
<br />       						TOR     shall      keep      the      Site      and     other     areas     free     from      								Underground    	Facilities   	not   	designated 	for
<br />							accumulations     of    waste     materials ,      rubbish ,     and     other     								removal ,  	relocation , 	or 	replacement 	in	the
<br />							debris .  	Removal     and     disposal     of    such    waste     materi-     								course   of   construction .
<br />							als ,     rubbish ,    and    other   debris    shall   conform    to   applica -
<br />							ble    Laws   and    Regulations .     																							B .  	CONTRACTOR    shall     comply   with    all    applica-
<br />    																																											ble       Laws       and       Regulations       relating      to      the      safety      of
<br />    									C .  	Cleaning: 	Prior    to     Substantial     Completion    of      				persons    or    property,    or   to   the    protection    of    persons    or
<br />							the      Work      CONTRACTOR      shall       clean      the      Site      and       				property   from     damage ,     injury,     or    loss ;     and     shall    erect
<br />							make    it    ready   for    utilization    by   OWNER .	At    the    com -      				and    maintain    all    necessary   safeguards   for   such    safety
<br />							pletion   of   the   Work    CONTRACTOR   shall    remove   from       				and     protection .       CONTRACTOR   shall    notify   owners    of
<br />							the     Site     all     tools ,      appliances ,     construction     equipment      				adjacent     property     and      of     Underground      Facilities     and
<br />							and  	machinery,  	and 	surplus 	materials 	and	shall       				other   utility   owners   when    prosecution   of   the   Work   may
<br />							restore   to   original    condition    all    property   not    designated       				affect      them ,	and       shall       cooperate      with       them       in      the
<br />							for   alteration    by  the    Contract    Documents .     												protection ,	removal ,       relocation ,       and       replacement      of
<br />    																																											their       property.     	All       damage ,	injury,       or       loss       to       any
<br />     									D .  	Loading    Structures :      CONTRACTOR   shall    not      				property    referred    to     in     paragraph    6 . 13 .A . 2    or    6 . 13 . A . 3
<br /> 							load     nor    permit    any    part    of   any   structure    to    be    loaded       				caused ,      directly     or      indirectly,      in     whole     or     in 
<br />    part,      by
<br /> 							in      any      manner     that      will      endanger     the      structure ,       nor      				CONTRACTOR ,      any    Subcontractor,      Supplier,     or    any
<br /> 							shall    CONTRACTOR    subject    any    part    of   the    Work    or      				other    individual    or   entity   directly   or   indirectly   employed
<br /> 							adjacent      property      to      stresses      or      pressures      that      will       				by   any   of   them    to    perform    any   of   the   Work,    or   anyone
<br /> 							endanger   it .    																													for     whose     acts      any    of    them      may     be     liable ,      shall      be
<br />     																																											remedied     by    CONTRACTOR    ( except    damage    or    loss
<br />  							6 .  12      				Record   Documents      																	attributable     to     the    fault    of     Drawings     or    Specifications
<br />     																																											or   to   the    acts    or    omissions    of   OWNER   or    ENGINEER
<br />     									A ,   	CONTRACTOR    shall    maintain    in    a   safe    place       				or     ENGINEER' s     Consultant ,      or     anyone     employed     by
<br />  							at    the    Site    one    record    copy   of   all    Drawings ,    Specifica-      				any     of    them  ,      or     anyone     for    whose     acts     any    of 
<br />  them
<br />  							tions ,    	Addenda ,     	Written    	Amendments ,    	Change       				may  	be  	liable ,  	and  	not 	attributable ,  	directly 	or
<br />  							Orders ,      Work      Change      Directives ,       Field      Orders ,      and       				indirectly,    in    whole    or    in    part ,    to   the   fault   or    negligence
<br />  							written     interpretations    and     clarifications     in     good     order      				of    CONTRACTOR     or    any    Subcontractor ,     Supplier ,     or
<br />   							and   	annotated  	to  	show  	changes   	made  	during       				other    individual    or    entity   directly   or    indirectly   employed
<br />   							construction . 	These    record     documents    together    with       				by	any	of	them ) .  		CONTRACTOR ' s 	duties 	and
<br />   							all  	approved  	Samples  	and 	a 	counterpart 	of 	all       				responsibilities      for       safety      and      for       protection       of      the
<br />   							approved      Shop      Drawings     will     be      available      to      ENGI -      				Work    shall    continue    until    such    time    as    all    the    Work
<br />   is
<br />   							NEER    for     reference .  	Upon     completion     of    the     Work ,       				completed       and       ENGINEER      has       issued      a      notice      to
<br />   							these    	record    	documents ,    	Samples ,    	and    	Shop       				OWNER	and 	CONTRACTOR	in	accordance       with
<br />    							Drawings   will    be   delivered    to    ENGINEER   for   OWNER .					paragraph  	14 . 07 . 13	that 	the 	Work 	is 	acceptable
<br />       																																											( except   as    otherwise   expressly    provided    in    connection
<br />    							6 .  13   		Safety   and   Protection    																		with   Substantial    Completion ) .
<br />										A.  	CONTRACTOR       shall       be       solely       responsible       				6 . 14  		Safety   Representative
<br />    							for       initiating ,       maintaining       and       supervising       all       safety
<br />     							precautions	and 	programs	in	connection       with	the  							A .  	CONTRACTOR       shall       designate       a       qualified
<br />     							Work . 		CONTRACTOR 	shall 	take 	all 	necessary      				and	experienced	safety       representative	at       the	Site
<br />      							precautions     for     the      safety     of,      and      shall       provide      the      				whose  	duties   	and   	responsibilities  	shall   	be  	the
<br />      							necessary    protection   to   prevent   damage ,     injury   or   loss       				prevention 	of	accidents 	and	the	maintaining	and
<br />      							to :																																			supervising   of   safety   precautions   and    programs .
<br />																																																												00700  -  General  Conditions  REV  04-07.doc
<br />   																																							00700  -  213
<br />       							F:\Engineering\Special  Projects\Eagle  Trace  Phase  2\Contract  Documents\Eagle  Trace  Subdivision  Phase  11;00700  -  General   Conditions  REV  04-07.doc
<br /> |