My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-307D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-307D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:54:55 AM
Creation date
10/1/2015 12:39:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/23/2008
Control Number
2008-307D
Agenda Item Number
8.O.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications Eagel Trace Subdivision Phase II
Area
NE Corner of Kings Hwy. and 61st. St.
Project Number
0813
Bid Number
2008074
Supplemental fields
SmeadsoftID
7602
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> SECTION 00800 - SUPPLEMENTARY CONDITIONS TO THE <br /> GENERAL CONDITIONS <br /> SC-1 . 00 Introduction <br /> These Supplementary Conditions amend or supplement the Standard General Conditions of the <br /> Construction Contract (No . 1910-8 , 1996 Edition) and other provisions of the Contract <br /> r Documents as indicated below. All provisions , which are not so amended or supplemented , <br /> remain in full force and effect . <br /> The terms used in these Supplementary Conditions will have the meanings indicated in the <br /> General Conditions . <br /> SC-1 . 01 Defined Terms <br /> SC-1 All A. 20 Add the following language at the end of GC- 1 . 01 .A. 20 : <br /> ENGINEER'S CONSULTANT: Name William B . Zentz & Associates , Inc. <br /> Address 684 Old Dixie Highway <br /> City , State , Zip Vero Beach , Florida 32960 <br /> Phone (772) 567-7552 <br /> SC-2. 05 Before Starting Construction <br /> SC-2 . 05 . C . Delete paragraph GC 2. 05. 0 in its entirety and insert the following paragraph in its <br /> place: <br /> C . Evidence of Insurance: CONTRACTOR shall not commence work under this <br /> Contract until he has obtained all insurance required under Article 5 and such <br /> insurance has been delivered to the OWNER and approved by the OWNER, nor <br /> shall the CONTRACTOR allow any Subcontractor to commence work on his <br /> subcontract until all similar insurance required of the Subcontractor has been so <br /> obtained and approved . All such insurance shall remain in effect until final <br /> payment and at all times thereafter when CONTRACTOR may be correcting , <br /> removing or replacing defective Work in accordance with Article 13 . <br /> SC -2.06 Preconstruction Conference <br /> SC-2 . 06 Delete paragraph GC 2. 06.A in its entirety and insert the following paragraph in its <br /> place: <br /> A. Immediately after awarding the contract, but before the CONTRACTOR begins <br /> work, the Engineer will call a preconstruction conference at a place the <br /> ENGINEER designates to establish an understanding among the parties as to <br /> the work and to discuss schedules referred to in paragraph 2 . 05. 13, procedures <br /> for handling Shop Drawings and other submittals , and maintaining required <br /> records . Utility companies and others as appropriate will be requested to attend <br /> to discuss and coordinate work. <br /> SC-3.06 Coordination of Plans, Specifications, and Special Provisions <br /> SC4 . 06 Add the following new paragraphs immediately after paragraph GC-3. 05: <br /> SC-3 . 06 Coordination of Plans, Specifications, and Special Provisions <br /> A. In case of discrepancy, the governing order of the documents shall be as follows: <br /> 1 . Written Interpretations <br /> 00800-1 <br /> 00800 - Supplementary Conditions REV 04-07.doc <br /> 008001 FAEnginseringlSpectal ProjectsVEagle Trace Phase Mmtract Documents\Eagle Trace Subdivision Phase M0800 - Supplementary Conditions REV 0447.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.