My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-307D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-307D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:54:55 AM
Creation date
10/1/2015 12:39:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/23/2008
Control Number
2008-307D
Agenda Item Number
8.O.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications Eagel Trace Subdivision Phase II
Area
NE Corner of Kings Hwy. and 61st. St.
Project Number
0813
Bid Number
2008074
Supplemental fields
SmeadsoftID
7602
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 . Drawings--That part of the Contract completion date or time prior to Substantial Comple- <br /> Documents prepared or approved by ENGINEER tion of all the Work . <br /> which graphically shows the scope , extent , and <br /> character of the Work to be performed by 28 . Notice of Award--The written notice by <br /> CONTRACTOR . Shop Drawings and other OWNER to the apparent successful bidder stating that <br /> CONTRACTOR submittals are not Drawings as so upon timely compliance by the apparent successful <br /> defined , bidder with the conditions precedent listed therein , <br /> OWNER will sign and deliver the Agreement. <br /> 18 . Effective Date of the Agreement--The <br /> date indicated in the Agreement on which it becomes 29 . Notice to Proceed--A written notice given <br /> effective , but if no such date is indicated , it means the by OWNER to CONTRACTOR fixing the date <br /> on <br /> date on which the Agreement is signed and delivered which the Contract Times will commence to run and <br /> by the last of the two parties to sign and deliver . on which CONTRACTOR shall start to perform the <br /> Work under the Contract Documents . <br /> 19 . ENGINEER--The individual or entity <br /> named as such in the Agreement. 30 . OWNER—The individual , entity, public <br /> body, or authority with whom CONTRACTOR has <br /> 20 . ENGINEER 's Consultant--An individual or entered into the Agreement and for whom the Work is <br /> entity having a contract with ENGINEER to furnish to be performed , <br /> services as ENGINEER' s independent professional <br /> associate or consultant with respect to the Project and 31 . Partial Utilization--Use by OWNER of a <br /> who is identified as such in the Supplementary substantially completed part of the Work for the pur- <br /> Conditions . pose for which it is intended ( or a related purpose ) <br /> prior to Substantial Completion of all the Work . <br /> 21 . Field Order--A written order issued by <br /> ENGINEER which requires minor changes in the 32 . PCBs--Polychlorinated biphenyls . <br /> Work but which does not involve a change in the <br /> Contract Price or the Contract Times , 33 . Petroleum--Petroleum , including crude oil <br /> or any fraction thereof which is liquid at standard <br /> 22 . General Requirements—Sections of conditions of temperature and pressure ( 60 degrees <br /> Division 1 of the Specifications . The General Fahrenheit and 14 . 7 pounds per square inch <br /> Requirements pertain to all sections of the Specifica- absolute ) , such as oil , petroleum , fuel oil , oil sludge <br />, oil <br /> tions . refuse , gasoline , kerosene , and oil mixed with other <br /> non-Hazardous Waste and crude oils . <br /> 23 . Hazardous Environmental Condition--The <br /> presence at the Site of Asbestos , PCBs , Petroleum , 34 . Project--The total construction of which <br /> Hazardous Waste , or Radioactive Material in such the Work to be performed under the Contract <br /> quantities or circumstances that may present a Documents may be the whole , or a part as may be <br /> substantial danger to persons or property exposed indicated elsewhere in the Contract Documents . t <br /> thereto in connection with the Work . <br /> 35 . Project Manual--The bound documentary <br /> 24 . Hazardous Waste —The term Hazardous information prepared for bidding and constructing the <br /> Waste shall have the meaning provided in Section Work . A listing of the contents of the Project <br /> Manual , <br /> 1004 of the Solid Waste Disposal Act ( 42 USC which may be bound in one or more volumes , is <br /> Section 6903 ) as amended from time to time . contained in the table ( s ) of contents . <br /> 25 . Laws and Regulations; Laws or Regulat- 36 . Radioactive Material--Source , special <br /> ions--Any and all applicable laws , rules , regulations , nuclear, or byproduct material as defined by the <br /> ordinances , codes , and orders of any and all govern - Atomic Energy Act of 1954 (42 USC Section 2011 <br /> et <br /> mental bodies , agencies , authorities , and courts seq . ) as amended from time to time . <br /> having jurisdiction . <br /> 37 . Resident Project Representative --The <br /> 26 . Liens--Charges , security interests , or authorized representative of ENGINEER who may be <br /> encumbrances upon Project funds , real property, or assigned to the Site or any part thereof. <br /> personal property. <br /> 38 . Samples--Physical examples of <br /> 27 . Milestone--A principal event specified in materials , equipment , or workmanship that are <br /> the Contract Documents relating to an intermediate representative of some portion of the Work and which <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 6 <br /> F.\Engineering\Special Projects\Eagle Trace Phase 2\Contract Documents\Eagle Trace Subdivision Phase 11\00700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.