My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-307B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-307B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:48:07 AM
Creation date
10/1/2015 12:40:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/23/2008
Control Number
2008-307B
Agenda Item Number
8.O.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications Eagle Trace Subdivision Phase II
Area
NE Corner of Kings Hwy. and 61st. St. Eagle Trace Subdivision
Project Number
0813
Bid Number
2008074
Supplemental fields
SmeadsoftID
7603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01009 <br /> SPECIAL PROVISIONS <br /> 1 . 1 GENERAL <br /> A . Visits to the construction site may be made by representatives of permitting or <br /> governing bodies . Submit details of all instructions from the above to the ENGINEER <br /> immediately . The Work will not be accepted by the OWNER until final acceptance has <br /> been received from the various Regulatory Agencies having jurisdiction . <br /> B . Furnish sufficient labor , construction equipment and materials , and work such hours , <br /> including night shifts and overtime operations , as may be necessary to insure the <br /> prosecution of the work in accordance with the approved progress schedule . If, in the <br /> opinion of the ENGINEER , the CONTRACTOR falls behind the progress schedule , take <br /> such steps as may be necessary to improve progress , all without additional cost to the <br /> OWNER . The ENGINEER shall be compensated for his overtime services in <br /> accordance with the Supplementary Conditions , SC-6 . 02 , <br /> C . In addition to these Specifications all work must comply with the requirements of the <br /> local governing agency , St . Johns River Water Management District , Department of <br /> Environmental Protection , Corps of Engineers , Indian River Farms Water Control <br /> District , and all other applicable State or Federal agencies' specifications and permits . <br /> In the event of a conflict , the more stringent specification or requirement shall govern . <br /> D . Before performing any work outside the designated limits of the work site , secure any <br /> necessary permits and authorization from the applicable owner , or verify in writing that <br /> such has been previously obtained . Follow all requirements of any said permits or <br /> authorization . Give the ENGINEER and appropriate owner ten ( 10 ) days minimum <br /> notice before commencing construction operations outside the designated limits of the <br /> work site . <br /> ** End of Section ** <br /> 01009-1 01009-Special Provisions <br /> FAEngineering\Special Projects\Eagle Trace Phase 2\Contract Documents\Eagle Trace Subdivision Phase II\01009 - Special Provisions .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.