Laserfiche WebLink
SECTION 01550 <br /> ACCESS ROADS , PARKING AREAS <br /> AND USE OF PUBLIC STREETS <br /> 1 . 1 GENERAL <br /> A . Provide all temporary construction roads , walks and parking areas required <br /> during construction and for use of emergency vehicles . Design and maintain <br /> temporary roads and parking areas so they are fully usable in all weather <br /> conditions . <br /> B . Prevent interference with traffic and the OWNER's operations on existing roads . <br /> Indemnify and save harmless the OWNER from any expenses caused by <br /> CONTRACTOR's operations over these roads . <br /> C . Roadways damaged by CONTRACTOR shall be restored to their original <br /> condition by the CONTRACTOR subject to approval of the OWNER or <br /> ENGINEER . <br /> D . Remove temporary roads , walks and parking areas prior to final acceptance and <br /> return the ground to its original condition , unless otherwise required by the <br /> Contract Documents . <br /> 1 . 2 USE OF PUBLIC STREETS <br /> The use of public streets and alleys shall be such as to provide a minimum of <br /> inconvenience to the public and to other traffic . Any earth or other excavated <br /> material spilled from trucks shall be removed immediately by the CONTRACTOR <br /> and the streets cleaned to the satisfaction of the OWNER . <br /> 1 . 3 USE OF PUBLIC STREETS FOR HAUL ROADS <br /> A . Prior to construction , the CONTRACTOR shall designate all proposed haul <br /> roads to be used during the life of the project. Any earth or other materials <br /> spilled from trucks shall be removed by the CONTRACTOR and streets <br /> cleaned to the satisfaction of the OWNER . He further shall be responsible <br /> for repairs to any damages caused by his operations , prior to final payment . <br /> 01550 Access Roads <br /> 01550-1 <br /> F:\Engineering\Special Projects\Eagle Trace Phase 2\Contract Documents\Eagle Trace Subdivision Phase I I\01550 - Access Roads.doc <br />