SECTION 01610 <br /> TRANSPORATION AND HANDLING OF MATERIALS AND EQUIPMENT <br /> 1 . 1 GENERAL <br /> A. Make all arrangements for transportation , delivery and handling of equipment <br /> and materials required for prosecution and completion of the Work . <br /> B . Shipments of materials to CONTRACTOR or Subcontractors shall be delivered <br /> to the site only during regular working hours . Shipments shall be addressed and <br /> consigned to the proper party giving name of Project , street number and city . <br /> Shipments shall not be delivered to OWNER except where otherwise directed . <br /> C . If necessary to move stored materials and equipment during construction , <br /> CONTRACTOR shall move or cause to be moved materials and equipment <br /> without any additional compensation . <br /> 1 . 2 DELIVERY <br /> A . Arrange deliveries of products in accord with construction schedules and in <br /> ample time to facilitate inspection prior to installation . <br /> B . Coordinate deliveries to avoid conflict with Work and conditions at site and to <br /> accommodate the following : <br /> 1 . Work of other contractors , or OWNER . <br /> 2 . Limitations of storage space . <br /> 3 . Availability of equipment and personnel for handling products . <br /> 4 . OWNER' S use of premises . <br /> have products delivered to project site until related Shop Drawings have <br /> C . Do not ha p p J <br /> been approved by the ENGINEER . <br /> D . Do not have products delivered to site until required storage facilities have been <br /> provided . <br /> E . Have products delivered to site in manufacturer' s original , unopened , labeled <br /> containers . Keep ENGINEER informed of delivery of all equipment to be <br /> incorporated in the Work . <br /> 01610-1 <br /> F :\Engineering\Special Projects\Eagle Trace Phase 2\Contract Documents\Eagle Trace Subdivision Phase 11M610 - Transportation and <br /> Handling of Materials and Equipment.doc <br />