My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-307B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-307B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:48:07 AM
Creation date
10/1/2015 12:40:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/23/2008
Control Number
2008-307B
Agenda Item Number
8.O.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications Eagle Trace Subdivision Phase II
Area
NE Corner of Kings Hwy. and 61st. St. Eagle Trace Subdivision
Project Number
0813
Bid Number
2008074
Supplemental fields
SmeadsoftID
7603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> L <br /> SECTION 01611 <br /> STORAGE OF MATERIAL AND EQUIPMENT <br /> 1 . 1 GENERAL <br /> A . Store and protect materials and equipment in accordance with manufacturer' s <br /> recommendations and requirements of Specifications . <br /> B . Make all arrangements and provisions necessary for the storage of materials <br /> and equipment . Place all excavated materials , construction equipment, and <br /> materials and equipment to be incorporated into the Work , so as not to injure <br /> any part of the Work or existing facilities , and so that free access can be had at <br /> all times to all parts of the Work and to all public utility installations in the vicinity <br /> of the Work . Keep materials and equipment neatly and compactly stored in <br /> locations that will cause a minimum of inconvenience to other contractors , <br /> public travel , adjoining owners , tenants and occupants . Arrange storage in a <br /> manner to provide easy access for inspection . <br /> C . Areas available on the construction site for storage of material and equipment <br /> shall be as shown or approved by the ENGINEER . <br /> D . Store materials and equipment which are to become the property of the <br /> OWNER to facilitate their inspection and insure preservation of the quality and <br /> fitness of the Work , including proper protection against damage by extreme <br /> temperatures and moisture . <br /> E . Do not use lawns , grass plots or other private property for storage purposes <br /> without written permission of the OWNER or other person in possession or <br /> control of such premises . <br /> F . CONTRACTOR shall be fully responsible for loss or damage to stored materials <br /> and equipment . <br /> G . Do not open manufacturers containers until time of installation unless <br /> recommended by the manufacturer or otherwise specified . <br /> H . When appropriate store materials on wood blocking so there is no contact with <br /> the ground . <br /> + + END OF SECTION + + <br /> 01611 -1 01611 —Storage of Material <br /> FAEngineering\Special Projects\Eagle Trace Phase 2\Contract Documents\Eagle Trace Subdivision Phase 11\01611 - Storage of <br /> Materials .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.