My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-307B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-307B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:48:07 AM
Creation date
10/1/2015 12:40:00 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
that all survey or existing site information is correct and accurate , without any <br /> reasonably inferable errors , inaccuracies or omissions . <br /> B . The CONTRACTOR shall carefully preserve all control stakes , benchmarks , <br /> reference points and property corners and will be responsible for any mistake or <br /> loss of time caused by their unnecessary loss or disturbance . If the loss or <br /> disturbance of the stakes or marks cause a delay in the Work , the <br /> CONTRACTOR shall have no claim for damages or extension of time . Control <br /> stakes , benchmarks , reference points and property corners disturbed by the <br /> CONTRACTOR' s work shall be replaced by a Florida Registered Land Surveyor <br /> and Mapper , at the CONTRACTOR's expense . In the event the Owner must <br /> provide the services of the Florida Registered Surveyor and Mapper to perform <br /> this replacement work, the cost of the surveying services will be deducted from <br /> any sums due the CONTRACTOR for the work performed under this Contract . <br /> C . All survey work shall be performed under the guidance and direction of a Florida <br /> Registered Surveyor and Mapper . <br /> D . All survey work for Record Drawings shall be performed by a Florida Registered <br /> Surveyor and Mapper . <br /> 1 . 3 STATION BOARDS <br /> r A . CONTRACTOR shall erect and maintain white/black standard FDOT station <br /> markers every 100 feet. <br /> 1 . 4 LAYOUT OF STRIPING <br /> Establish by instrument , and mark the finished surface , the points necessary for <br /> striping finished roadway in conformance with Section 5J of FDOT Standard <br /> Specifications . <br /> + + END OF SECTION + + <br /> r <br /> 1050-2 01050 Field Engineering <br /> FAEngineering\Special Projects\Eagle Trace Phase Montract Documents\Eagle Trace Subdivision Phase1eeri0g doc Field <br />
The URL can be used to link to this page
Your browser does not support the video tag.