My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-307B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-307B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:48:07 AM
Creation date
10/1/2015 12:40:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/23/2008
Control Number
2008-307B
Agenda Item Number
8.O.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications Eagle Trace Subdivision Phase II
Area
NE Corner of Kings Hwy. and 61st. St. Eagle Trace Subdivision
Project Number
0813
Bid Number
2008074
Supplemental fields
SmeadsoftID
7603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> Joints in bell and spigot pipe shall be push-on , mechanical , or <br /> restrained joints in accordance with AWWA Standard C- 111 (ANSI <br /> 21 . 11 -85 ) , or latest revision . Mechanical joint pipe set-screw type <br /> retainer glands will not be permitted . <br /> 4 . Flanged Connections <br /> Flanged pipe with screwed -on flanges shall be furnished with long <br /> hubs , and the flanges shall be screwed on the threaded end of the <br /> pipe in the shop , and the face of the flange and end of pipe refaced <br /> together. There shall be no leakage through the pipe threads and <br /> the flanges shall be designed to .prevent corrosion of the threads <br /> from outside . The back of the hub shall be caulked where the hub <br /> threads joint with the pipe . <br /> F . Disinfecting Potable Water Pipelines <br /> Before being placed in service , all potable water pipelines shall be <br /> chlorinated in accordance with the latest edition of AWWA C-651 , <br /> " Standard Procedure for Disinfecting Water Mains" , except that the use of <br /> tablets is strictly prohibited . The procedure shall be approved by the <br /> Engineer . The location of the chlorination and sampling points will be as <br /> specified by the Florida Department of Environmental Protection , Water <br /> Distribution System Permit . Taps for chlorination and sampling shall be <br /> uncovered and backfilled by the Contractor, as required . <br /> G . Payment Shall Be Made Under: <br /> Item No . UT 3 Fire Hydrant Relocation — Each <br /> Item No . UT 1 Trace Wire Repair — Each <br /> Item No . UT 2 Valve Marker Installation — Each <br /> ** END OF SECTION" <br /> t <br /> F :\Engineering\Special Projects\Eagle Trace Phase 2\Contract Documents\Eagle Trace Subdivision Phase "61 1A <br /> & 0001 - Technical Provisions. doc - 15 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.