My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-307B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-307B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:48:07 AM
Creation date
10/1/2015 12:40:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/23/2008
Control Number
2008-307B
Agenda Item Number
8.O.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications Eagle Trace Subdivision Phase II
Area
NE Corner of Kings Hwy. and 61st. St. Eagle Trace Subdivision
Project Number
0813
Bid Number
2008074
Supplemental fields
SmeadsoftID
7603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> RAINFALL SHUTOFF DEVICE <br /> A . RAINFALL SHUT OFF DEVICES SHALL BE CAPABLE OF BEING <br /> INCREMENTALLY ADJUSTED TO ACTIVATE AT A RANGE OF <br /> RAINFALL AMOUNTS . THE RAINFALL SHUTOFF DEVICE SHALL BE <br /> PROGRAMMED TO THE LOCAL WATER MANAGEMENT DISTRICT <br /> CURRENT REGULATED LEVEL , <br /> INSTALLATION <br /> PRE -INSTALLATION <br /> A. VERIFY LOCATION OF EXISTING UTILITIES WITH MUNICIPAL AND <br /> PRIVATE UTILITIES AND WITH THE PROPERTY OWNER . <br /> Be OBTAIN ALL NECESSARY PERMITS AND LICENSES . <br /> C . INSPECT THE SITE FOR EXISTING CONDITIONS THAT WILL <br /> AFFECT THE IRRIGATION SYSTEM DESIGN OR INSTALLATION , <br /> AND DEVELOP A PLAN TO MINIMIZE DISTURBANCE OF EXISTING <br /> AND/OR PROPOSED STRUCTURES AND LANDSCAPE . <br /> INSTALLATION OF BACKFLOW PREVENTION ASSEMBLIES <br /> A . FLUSH AIL LINES BEFORE INSTALLING BACKFLOW PREVENTION <br /> ASSEMBLIES . <br /> Be PROVIDE PROTECTION OF BACKFLOW PREVENTION <br /> ASSEMBLIES IF THEY ARE INSTALLED IN A MANNER THAT <br /> SUBJECTS THEM TO ANNUAL DAMAGE BY FREEZING <br /> TEMPERATURES . <br /> C . INSTALL WITH ROOM TO ALLOW FOR SERVICE AND TEST . DCA <br /> AND RPZ DEVICES MUST BE INSTALLED HORIZONTALLY <br /> UNLESS APPROVED FOR VERTICAL INSTALLATION BY A <br /> RECOGNIZED TESTING AUTHORITY . <br /> PIPE INSTALLATION <br /> A . FLAG THE LOCATION OF ALL SPRINKLERS , VALVES , <br /> CONTROLLERS , SOURCE OF WATER AND ELECTRICAL <br /> COMPONENTS IN THE FIELD PRIOR TO INSTALLATION . <br /> Be CONDUCT ALL NECESSARY EXCAVATION FOR THE PROPER <br /> INSTALLATION OF PIPELINES AND ACCESSORIES . DEWATER , <br /> SHORE , AND BRACE AS NEEDED TO COMPLETELY INSTALL THE <br /> PIPE , <br /> C . PIPE SHALL BE INSTALLED AT SUFFICIENT DEPTH BELOW <br /> GROUND TO PROTECT IT FROM HAZARDS SUCH AS VEHICULAR <br /> TRAFFIC , DEPTHS OF COVER SHALL CONFORM TO NRCS— FL— <br /> 430— DD , WATER CONVEYANCE , AS FOLLOWS : <br /> I . VEHICLE TRAFFIC AREAS <br /> PIPE SIZE ( INCHES) DEPTH OF COVER* ( INCHES ) <br /> 1 /2 of — 2" 18 " <br /> 3"-5 " 24 " <br /> 6" AND LARGER 36" <br /> F:\Engineering\Special Projects\Eagle Trace Phase 2\Contract Documents\Eagle Trace Subdivision Phase <br /> II\IRRIGATION SPECIFICATIONS from W. F. McCain .doc - 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.