My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-307B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-307B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:48:07 AM
Creation date
10/1/2015 12:40:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/23/2008
Control Number
2008-307B
Agenda Item Number
8.O.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications Eagle Trace Subdivision Phase II
Area
NE Corner of Kings Hwy. and 61st. St. Eagle Trace Subdivision
Project Number
0813
Bid Number
2008074
Supplemental fields
SmeadsoftID
7603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 . RECORD THE AMOUNT OF WATER ADDED TO THE SYSTEM <br /> OVER THE 2 HOUR PERIOD , <br /> 4 , USE THE FOLLOWING FORMULAS TO DETERMINE THE <br /> MAXIMUM ALLOWABLE LEAKAGE LIMIT OF GASKETED PIPE , <br /> DUCTILE IRON LEAKAGE FORMULA : <br /> L = S DP/ 133 , 200 <br /> WHERE : <br /> L = ALLOWABLE LEAKAGE ( GPHJ , <br /> D = NOMINAL DIAMETER OF PIPE ( INCHES ) , <br /> P = AVERAGE TEST PRESSURE ( PSI ) , AND <br /> S = LENGTH OF PIPE ( FT) . <br /> PVC GASKETED JOINT LEAKAGE FORMULA: <br /> L = ND P <br /> 7400 <br /> WHERE : <br /> L = ALLOWABLE LEAKAGE ( GPH ) , <br /> N = NUMBER OF JOINTS , <br /> D = NOMINAL DIAMETER OF PIPE ( INCHES ) , <br /> P = AVERAGE TEST PRESSURE ( PSI ) . <br /> Be PVC SOLVENT—WELD PIPE CONNECTIONS SHALL HAVE NO <br /> LEAKAGE , POLYETHYLENE CONTROL TUBING LINES SHALL <br /> HAVE NO LEAKAGE . <br /> C . WHEN TESTING A SYSTEM WHICH CONTAINS METAL=SEATED <br /> VALVES , AN ADDITIONAL LEAKAGE PER CLOSED VALVE OF 0 . 078 <br /> GPH/ INCH OF NOMINAL VALVE SIZE IS ALLOWED . <br /> D . REPAIR ALL LEAKS AND RETEST THE PIPELINE UNTIL IT PASSES <br /> THE TEST , <br /> APPLICATION UNIFORMITY TESTING. <br /> A . THE UNIFORMITY OF APPLICATION IS A MEASURE OF SYSTEM <br /> PERFORMANCE , FACTORS AFFECTING UNIFORMITY ARE : <br /> 1 . WIND , <br /> 2 , SPACING OF SPRINKLERS , <br /> 3 , WATER PRESSURE AT THE SPRINKLER . <br /> 4 , NOZZLE SIZES AND COMPATIBILITY BETWEEN SPRINKLERS . <br /> 5 , SPRINKLER DISCHARGE PATTERN . <br /> 6 . SPEED AND UNIFORMITY OF ROTATION OF ROTARY <br /> SPRINKLERS , <br /> 7 . RADIUS ADJUSTMENT . <br /> Be APPLICATION UNIFORMITY TESTING IS NOT MANDATORY . <br /> HOWEVER , IF IT IS DESIRED TO CONDUCT A UNIFORMITY TEST , <br /> IN ADDITION TO THE OTHER TESTS DESCRIBED HEREIN , IT <br /> SHOULD BE CONDUCTED IN ACCORDANCE WITH ASAE S-398 . 1 , <br /> PROCEDURE FOR SPRINKLER TESTING AND PERFORMANCE <br /> REPORTING , THE UNIFORMITY OF MICROIRRIGATION SYSTEMS <br /> F:\Engineering\Special Projects\Eagle Trace Phase 2\Contract Documents\Eagle Trace Subdivision Phase <br /> II\IRRIGATION SPECIFICATIONS from W. F. McCain .doc - 13 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.