My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-307B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-307B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 11:48:07 AM
Creation date
10/1/2015 12:40:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/23/2008
Control Number
2008-307B
Agenda Item Number
8.O.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications Eagle Trace Subdivision Phase II
Area
NE Corner of Kings Hwy. and 61st. St. Eagle Trace Subdivision
Project Number
0813
Bid Number
2008074
Supplemental fields
SmeadsoftID
7603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
progresses . Control delivery schedules so as to minimize unnecessary long -term <br /> storage at the project site prior to installation . <br /> 1 . 5 PROJECT PHOTOG <br /> RAPHSNIDEOS <br /> A. The CONTRACTOR shall make provisions , at his expense , for video tapes of <br /> all work areas just prior to construction , and for unusual conditions during <br /> construction . The videos shall show pertinent physical features along the line of <br /> construction . The purpose of the videos is to determine any damage to private <br /> or public property during construction . <br /> B . Pre-Construction Video : <br /> 1 . Contractor shall provide the Owner with a video record and one copy of the <br /> existing conditions prior to construction . This video shall be a standard VHS <br /> cassette format , and shall be narrated . <br /> 2 . The video shall include , but not be limited to , the following items shown in a <br /> clear manner: <br /> 1 ) All existing features within the right-of-way . <br /> 2 ) All existing features within the temporary construction easement . <br /> 3 ) All existing features within permanent easements . <br /> 4 ) All existing features adjacent to any construction . <br /> 3 . Detail of the video shall be such that the following examples shall be clear <br /> and visible : <br /> 1 ) Cracks in walls . <br /> 2 ) Condition of fencing . <br /> 3 ) Condition of planted areas and types of vegetation . <br /> 4 ) Condition of sodded areas . <br /> 5 ) Conditions of sprinkler systems and associated controls and wiring . <br /> 6 ) Condition of signs . <br /> 7 ) Conditions of lighting and associated wiring . <br /> 8 ) Significant detail of any pre-existing damages physical features shall be <br /> shown . The coverage of the video should include the limits of effects of <br /> the use of vibratory rollers . <br /> 9 ) This video record shall be presented to the Owner within 30 days of the <br /> Notice to Proceed . A copy shall be kept in the Contractor' s field office . <br /> 10 ) Payment — No additional payment will be made for this work . <br /> + + END OF SECTION + + <br /> 01215-2 01215 General Quality control <br /> F:\Engineering\Special Projects\Eagle Trace Phase 2\contract Documents\Eagle Trace Subdivision Phase II\01 QualitGeneral <br />
The URL can be used to link to this page
Your browser does not support the video tag.