My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-010
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2016 2:10:26 PM
Creation date
9/30/2015 7:12:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/13/2004
Control Number
2004-010
Agenda Item Number
7.E.
Entity Name
Treasure Coast Contracting
Subject
Kingslake Subdivision water assessment
Area
Rainbow Dr. and 58th Ave.
Project Number
UCP2297
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3584
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
payments prior to Substantial Completion will be in an amount equal to <br /> 100 % of the work completed . <br /> 50% of materials and equipment not incorporated in the work ( but <br /> delivered , suitably stored and accompanied by documentation satisfactory <br /> to OWNER as provided in Paragraph 14 . 02 of the General Conditions ) . <br /> 5 . 1 . 2 Upon Substantial Completion in an amount sufficient to increase total <br /> payments to CONTRACTOR to 100 % of the Contract price , less such <br /> amounts as ENGINEER shall determine , or OWNER may withhold , in <br /> accordance with Paragraph 14 . 07 of the General Conditions . <br /> 5 . 2 Final payment . Upon final completion and acceptance of the work in accordance <br /> with Paragraph 14 . 07 of the General Conditions , OWNER shall pay the remainder <br /> of the Contract Price as recommended by ENGINEER as provided in said <br /> Paragraph 14 . 07 , <br /> ARTICLE 6 . INTEREST, <br /> Not Applicable . <br /> ARTICLE 7 . CONTRACTOR'S REPRESENTATIONS . <br /> In order to induce OWNER to enter into this Agreement , CONTRACTOR makes the following <br /> representations : <br /> 7 . 1 CONTRACTOR has familiarized itself with the nature and extent of the Contract <br /> Documents , work , site , locality, and all local conditions and laws and regulations <br /> that in any manner may affect cost , progress , performance or furnishing of the <br /> work . <br /> 7 . 2 CONTRACTOR has studied carefully all reports of explorations and tests of <br /> subsurface conditions and drawings of physical conditions which are identified in <br /> the Supplementary Conditions as provided in Paragraph 4 . 02 of the General <br /> Conditions , and accepts the determination set forth in Paragraph SC-4 . 02 of the <br /> Supplementary Conditions of the extent of the technical data contained in such <br /> reports and drawings upon which CONTRACTOR is entitled to rely. <br /> 7 . 3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br /> obtaining and carefully studying ) all such examinations , investigations , <br /> explorations , tests , reports and studies ( in addition to or to supplement those <br /> referred to in Paragraph 7 . 2 above ) which pertain to the subsurface or physical <br /> conditions at or contiguous to the site or otherwise may affect the cost, progress , <br /> performance or furnishing of the work as CONTRACTOR considers necessary for <br /> the performance of furnishing of the work at the Contract Price , within the Contract <br /> Time and in accordance with the other terms and conditions of the Contract <br /> 00530-4 <br /> R\Urilities\UTILITY - ENGINEERING\Projects - Assessment Projects\KINGSLAKEWATER ASSESSMENT-1JCP#2297\eng\bid <br /> docs\00530 EJCDC - Agreement between Owner and Contractor.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.