My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-106
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 3:48:51 PM
Creation date
9/30/2015 6:29:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
05/06/2003
Control Number
2003-106
Agenda Item Number
11.C.1.
Entity Name
Department of Utility Services
Subject
16" Brine Pipeline-Addendum No.1
Area
58th Ave from77th St to 57th St and East on 57th St to Bent Pine R.I.B. Site
Project Number
UCP 2208
Bid Number
5050
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3231
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' SECTION 01025 <br /> MEASUREMENT AND PAYMENT <br /> ' PART 1 — GENERAL <br /> 1 . 01 GENERAL <br /> Measurement and payment will be based upon work completed and accepted <br /> in accordance with the Contract Documents . No separate payment will be <br /> made for excavation , trenching dewatering , backfilling , leakage tests , <br /> surveying , density tests , or other incidental items of work not shown in the <br /> Agreement . <br /> 1 . 02 EQUIPMENT AND MATERIALS IN STORAGE <br /> ' Partial payment for materials and equipment in proper storage at the site of <br /> the work or other approved storage site will be made for those items for which <br /> the Contractor has submitted paid invoices to the Engineer. The partial <br /> i payment for stored materials will be 50% of the value of materials and <br /> ■ equipment, based on receipted bilis, fumished but not incorporated in the <br /> work, as determined by Engineer. <br /> ' 1 . 03 MEASUREMENT <br /> ' A. Mobilization : Measurement shall be on a lump sum basis , and shall be <br /> limited to the following maximum amounts: <br /> ORIGINAL CONTRACT AMOUNT ($) MAXIMUM AMOUNT OF <br /> FROM MORE THAN TO AND INCLUDING ITEM FOR MOBILIZATION <br /> 0 100 , 000 31000 <br /> ' 100,000 5001000 15, 000 <br /> 500,000 11000,000 30, 000 <br /> 11000,000 2 ,000, 000 60,000 <br /> 21000 ,000 32000, 000 90 , 000 <br /> . , 31000, 000 49000 , 000 120 , 000 <br /> 41000, 000 510002000 1253000 <br /> ' 51000,000 6 , 000 , 000 150, 000 <br /> 61000, 000 71000,000 175 ,000 <br /> 70000, 000 10, 000, 000 200,000 <br /> ' 10 , 000 , 000 -- 2509000 <br /> Should the lump sum price bid for the item Mobilization exceed the maximum <br /> permissible amount for this item , as specked herein , the bid price will be <br /> ' reduced to the maximum permissible amount, and the reduced price will be <br /> used in correctly determining the total price for comparison of bids received . <br /> The cost of video taping the pre-construction condition shall be included in <br /> the lump-sum cost of mobilization . <br /> 01025- 1 <br /> BASpedfica*ms" 025 Measurement and Paymentdoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.