My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-106
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 3:48:51 PM
Creation date
9/30/2015 6:29:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
05/06/2003
Control Number
2003-106
Agenda Item Number
11.C.1.
Entity Name
Department of Utility Services
Subject
16" Brine Pipeline-Addendum No.1
Area
58th Ave from77th St to 57th St and East on 57th St to Bent Pine R.I.B. Site
Project Number
UCP 2208
Bid Number
5050
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3231
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i6. BID SECURITY <br /> 6 . 1 Each Bid must be accompanied by Bid security made payable to Owner in an <br /> amount of five percent of the Bidder's maximum bid price and in the form of a <br /> certified or bank check or a Bid Bond issued by a surety meeting the <br /> requirements of Paragraph 5 . 1 of the General Conditions, <br /> 6 . 2 The Bid security of the Successful Bidder will be retained until such Bidder has <br /> executed the Agreement and furnished the required Contract security, whereupon <br /> the Bid security will be returned . If the Successful Bidder fails to execute and <br /> deliver the Agreement and furnish the required Contract security within fifteen <br /> days after the Notice of Award , Owner may annul the Notice of Award , and the <br /> Bid security of that Bidder will be forfeited . <br /> The Bid security of other Bidders whom Owner believes to have a reasonable <br /> chance of receiving the award may be retained by the Owner until the earlier of <br /> the seventh day after the effective date of the Agreement or the sixty-first day <br /> after the Bid opening , whereupon Bid security furnished by such Bidders will be <br /> returned . Bid security with bids which are not competitive may be returned before <br /> the end of the sixty-day period . <br /> 7. CONTRACT TIME <br /> The number of days within which , or dates by which , the work is to be substantially <br /> completed and also complete and ready for final payment (the Contract Time) are set <br /> forth in the Bid Form and the Agreement. <br /> 8 . LIQUIDATED DAMAGES <br /> Provisions for liquidated damages , if any, are set forth in the Agreement. <br /> 9. SUBSTITUTE OR "OR EQUAL" ITEMS <br /> The Contract, if awarded , will be on the basis of materials and equipment described in <br /> the Drawings or specified in the Specifications without consideration of possible <br /> substitute or "or equal' items. Whenever it is indicated in the Drawings or specified in <br /> the Specifications that a substitute or "or equal' item of material or equipment may be <br /> furnished or used by Contractor if acceptable to Engineer, application for such <br /> acceptance will not be considered by Engineer until after the Effective Date of the <br /> Agreement. The procedure for submission of any such application by Contractor and <br /> consideration by Engineer is set forth in Paragraphs 6. 7. 1 , 6 . 7 . 2 , and 6 . 7 . 3 of <br /> the <br /> General Conditions and may be supplemented in the General Requirements . <br /> ' 10. BID FORM <br /> 10 . 1 The Bid Form is included with the Bidding Documents; additional copies <br /> may be obtained from Engineer (or the issuing office) . <br /> 10. 2 All blanks on the Bid Form must be completed in ink or by typewriter. <br /> 00100-4 <br /> c:Wty Documentslprojeds102621Specitications=100 Instruction To Bidders.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.