My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-106
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 3:48:51 PM
Creation date
9/30/2015 6:29:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
05/06/2003
Control Number
2003-106
Agenda Item Number
11.C.1.
Entity Name
Department of Utility Services
Subject
16" Brine Pipeline-Addendum No.1
Area
58th Ave from77th St to 57th St and East on 57th St to Bent Pine R.I.B. Site
Project Number
UCP 2208
Bid Number
5050
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3231
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01381 <br /> AUDIO -VISUAL DOCUMENTATION <br /> PART 1 -- GENERAL <br /> ' 1 . 01 DESCRIPTION OF WORK <br /> Prior to commencing the Work, the Contractor shall have a continuous <br /> color audio-video tape recording taken along the entire length of the <br /> Project to serve as a record of preconstruction conditions . The <br /> preconstruction swale elevations shall be recorded at 100 ' intervals . <br /> 1 . 02 APPROVAL <br /> No construction shall begin prior to review and acceptance of the tapes <br /> covering the construction area by the Engineer. The Engineer shall have <br /> the authority to reject all or any portion of a videotape not conforming to <br /> ' <br /> specifications and order that it be redone at no additional charge . The <br /> Contractor shall reschedule unacceptable coverage within five (5) days <br /> after being notified . The Engineer shall designate those areas , if any , to <br /> be omitted from or added to the audio-video coverage . Tape recordings <br /> shall not be made more than thirty (30) days prior to beginning of <br /> construction in any area . All tapes and written records shall become <br /> property of Owner. The tapes shall be delivered to the Owner as soon as <br /> ' possible after recording . <br /> 1 . 03 QUALITY ASSURANCE <br /> ' The Contractor shall engage the services of a professional <br /> electrographer. The color audio-video tapes shall be prepared by a <br /> responsible commercial firm known to be skilled and regularly engaged in <br /> the business of preconstruction color audio-video tape documentation . <br /> PART 2 — PRODUCTS <br /> . 2 .01 GENERAL <br /> All equipment, accessories , materials , and labor to perform this service <br /> shall be furnished by the Contractor. <br /> 2 .02 QUALITY <br /> The total audio-video system shall reproduce bright, sharp , clear pictures <br /> with accurate colors and shall have minimal distortion , tearing , rolls , or <br /> other imperfections. The audio portion of the recording shall reproduce <br /> the commentary of the camera operator with proper volume and clarity <br /> and be free from distortion and interruptions . <br /> ' 01381 - 1 <br /> UGinny%e\Spec fications\01381 Audio-Visual Documentation.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.