2 .2. 8 . Polyethylene (PE) Pressure Pipe <br /> Installation (Cont' d) <br /> If a defective pipe is discovered after it has been installed, it shall be removed and replaced with <br /> a sound pipe in a satisfactory manner at no additional cost to the Owner. All pipe and fittings <br /> shall be thoroughly cleaned before installation, shall be kept clean until they are used in the work <br /> and when laid, shall conform to the lines and grades required. <br /> As soon as the excavation is complete to normal grade of the bottom of the trench, bedding shall <br /> be placed, compacted and graded to provide firm, uniform and continuous support for the pipe . <br /> Bell holes shall be excavated so that only the barrel of the pipe bears upon the bedding. The pipe <br /> shall be laid accurately to the lines and grades indicated on the Drawings. Blocking under the <br /> pipe will not be permitted. Bedding shall be placed evenly on each side of the pipe to mid- <br /> diameter and hand tools shall be used to force the bedding under the haunches of the pipe and <br /> into the bell holes to give firm continuous support for the pipe. Bedding shall then be placed to <br /> 12-in above the top of the pipe. The initial 3 -ft of backfill above the bedding shall be placed. in <br /> I -ft layers and carefully compacted. Generally the compaction shall be done evenly on each side <br /> of the pipe and compaction equipment shall not be operated directly over the pipe until sufficient <br /> backfill has been placed to ensure that such compaction equipment will not have a damaging <br /> effect on the pipe. Equipment used in compacting the initial 3 -ft backfill shall be approved by <br /> the pipe manufacturer' s representative prior to use. <br /> Good alignment shall be preserved during installation. The deflection at joints shall not exceed <br /> that recommended by manufacturer. Fittings, in addition to those shown on the Drawings, shall <br /> be provided, if required, in crossing utilities which may be encountered upon opening the trench. <br /> Each length of the pipe shall have the assembly mark aligned with the pipe previously laid and <br /> held securely until enough backfill has been placed to hold the pipe in place. Joints shall not be <br /> "pulled" or "cramped". <br /> Before any joint is made, the pipe shall be checked to assure that a close joint with the next <br /> adjoining pipe has been maintained and that the inverts are matched and conform to the required <br /> grade. The pipe shall not be driven down to grade by striking it. <br /> Precautions shall be taken to prevent flotation of the pipe in the trench. <br /> When moveable trench bracing such as trench boxes, moveable sheeting, shoring or plates are <br /> used to support the sides of the trench, care shall be taken in placing and moving the boxes or <br /> supporting bracing to prevent movement of the pipe, or disturbance of the pipe bedding and the <br /> backfill. Trench boxes, moveable sheeting, shoring or plates shall not be allowed to extend <br /> below the top of the pipe. As trench boxes, moveable sheeting, shoring or plates are moved, pipe <br /> bedding shall be placed to fill any voids created and the backfill shall be recompacted to provide <br /> uniform side support for the pipe. <br /> Restrained joints shall be installed where shown on the Drawings or as directed by the Engineer. <br /> 27 <br /> r <br />