Laserfiche WebLink
TABLE OF CONTENTS <br /> DIVISION 0 - BIDDING AND CONTRACT REQUIREMENTS <br /> i 00020 Advertisement for Bids <br /> i 00100 Instruction to Bidders <br /> 00310 Bid Form <br /> 00452 Disclosure of Relationships <br /> 00456 General Information Required for Bidders <br /> 00530 EJCDC - Agreement Between Owner and Contractor <br /> 00610 Construction Performance Bond <br /> 00612 Construction Payment Bond <br /> 00700 General Conditions <br /> ' 00800 Supplementary Conditions <br /> DIVISION 1 = GENERAL REQUIREMENTS <br /> 01000 Summary of Work <br /> 01025 Measurement and Payment <br /> 01060 Regulatory Requirements and Notification <br /> 01090 Reference Standards <br /> ' 01152 Applications for Payment <br /> 01153 Change Order Procedures <br /> 01201 Preconstruction Conference <br /> ' 01311 Construction Schedules <br /> 01340 Shop Drawings , Product Data and Samples <br /> 01381 Audio-Visual Documentation <br /> 01410 Testing Laboratory Services <br /> 01510 Temporary Utilities <br /> 01560 Temporary Controls <br /> 01600 Material and Equipment <br /> 01700 Contract Close-out <br /> 01710 Cleaning <br /> 01720 Project Record Documents <br /> 01740 Warranties and Bonds <br /> DIVISION 2 - SITE WORK <br /> ' 2. 1 . 1 . Mobilization <br /> 2 . 1 .2 , Clearing Site <br /> 2 . 1 . 3 . Maintenance of Traffic <br /> 2 . 1 .4 , Engineer's Field Office <br /> ' 2 . 2 . 1 . Excavation for Test Pits-Unclassified <br /> 2 . 2 . 2 . Saw Cut Pavement <br /> 2 .2 . 3. Pavement Excavation <br /> ' 2 . 2.4 . Brine Mains <br /> 2 .2 . 5 , Fittings <br /> 2 .2 . 6, Gate Valves & Valve Boxes <br /> ' 2 . 2 . 7. Directional Boring <br /> 2.2 . 8 . Polyethylene (PE) Pressure Pipe <br /> 2 . 2 . 9 . Audio-Video Taping <br /> 2.2 . 10 , Air Release Valves <br /> CAMy Documents\projects\0262\Spwifications\W2 Table of Contents.doc <br />