B. Substitute Construction Methods or Prooedures: If a an acceptable replacement for the rejected Subcontractor, <br /> specific means, method, technique, sequence, or procedure of Supplier, or other individual or entity, and the Contract Price will <br /> construction is shown or indicated in and expressly required by be adjusted by the difference in the cost occasioned by <br /> such <br /> the Contract Documents, CONTRACTOR may furnish or utilize replacement, and an appropriate Change Order will be issued <br /> ' a substitute means, method, technique, sequence, or procedure or Written Amendment signed. No acceptance by OWNER of <br /> of construction approved by ENGINEER. CONTRACTOR shall any such Subcontractor, Supplier, or other individual or entity, <br /> submit sufficient information to allow ENGINEER, in whether initially or as a replacement, shall constitute a waiver of <br /> ENGINEER's sole discretion, to determine that the substitute any right of OWNER or ENGINEER to reject defective Work. <br /> proposed is equivalent to that expressly called for by the <br /> Contract Documents. The procedure for review by ENGINEER C. CONTRACTOR shall be fully responsible to OWNER <br /> will be similar to that provided in subparagraph 6.05A2. and ENGINEER for all ads and omissions of the <br /> Subcontractors, Suppliers, and other individuals or entities <br /> C. Engineer's Evaluation: ENGINEER will be allowed a performing or furnishing any of the Work just as <br /> reasonable time within which to evaluate each proposal or CONTRACTOR is responsible for CONTRACTOR's own acts <br /> submittal made pursuant to paragraphs 6.05A and 6.05. 6. and omissions. Nothing in the Contract Documents shall create <br /> ENGINEER will be the sole judge of acceptability. No equar for the benefit of any such Subcontractor, Supplier, <br />or other <br /> or substitute will be ordered, installed or utilized until individual or entity any contractual relationship between <br /> ENGINEER's review is complete, which will be evidenced by OWNER or ENGINEER and any such Subcontractor, Supplier <br /> either a Change Order for a substitute or an approved Shop or other individual or entity, nor shall it create any <br />obligation on <br /> Drawing for an "or equal.' ENGINEER will advise the part of OWNER or ENGINEER to pay or to see to the <br /> CONTRACTOR in writing of any negative determination. payment of any moneys due any such Subcontractor, Supplier, <br /> or other individual or entity except as may otherwise be required <br /> D. Special Guarantee: OWNER may require by Laws and Regulations. <br /> CONTRACTOR to furnish at CONTRACTOR's expense a <br /> special performance guarantee or other surety with respect to D. CONTRACTOR shall be solely responsible for <br /> any substitute. scheduling and coordinating the Work of Subcontractors, <br /> Suppliers, and other individuals or entities performing or <br /> E. ENGINEER's Cost Reimbursement ENGINEER will furnishing any of the Work under a direct or indirect contract <br /> record time required by ENGINEER and ENGINEER's with CONTRACTOR. <br /> Consultants in evaluating substitute proposed or submitted by <br /> CONTRACTOR pursuant to paragraphs 6.05A.2 and 6.05. 6 E. CONTRACTOR shall require all Subcontractors, <br /> and in making changes in the Contract Documents (or in the Suppliers, and such other individuals or entities <br /> performing or <br /> provisions of any other direct contract with OWNER for work on furnishing any of the Work to communicate with ENGINEER <br /> the Project) occasioned thereby. Whether or not ENGINEER through CONTRACTOR. <br /> approves a substitute item so proposed or submitted by <br /> CONTRACTOR, CONTRACTOR shall reimburse OWNER for F. The divisions and sections of the Specifications and <br /> the charges of ENGINEER and ENGINEER's Consultants for the identifications of any Drawings shall not control <br /> evaluating each such proposed substitute. CONTRACTOR in dividing the Work among Subcontractors or <br /> Suppliers or delineating the Work to be performed by any <br /> F. CONTRACTOR's Expense: CONTRACTOR shall specific trade. <br /> provide all data in support of any proposed substitute or <br /> 'or-equar at CONTRACTOR's expense. G. All Work performed for CONTRACTOR by a <br /> Subcontractor or Supplier will be pursuant to an appropriate <br /> 6.06 Conoeming Subcontractors, Suppliers, and Others agreement between CONTRACTOR and the Subcontractor or <br /> Supplier which specifically binds the Subcontractor or Supplier <br /> A. CONTRACTOR shall not employ any Subcontractor, to the applicable terms and conditions of the <br />Contract <br /> Supplier, or other individual or entity (including those acceptable Documents for the benefit of OWNER and ENGINEER. <br /> to ,OWNER as imrkated in paragraph 6.06.6), whether initially Whenever any such agreement is with a Subcontractor <br /> or <br /> or as a replacement against whom OWNER may have Supplier who is listed as an additional insured on the <br /> property <br /> reasonable objection. CONTRACTOR shall not be required to insurance provided in paragraph 5.06, the agreement between <br /> employ any Subcontractor, Supplier, or other individual or entity the CONTRACTOR and the Subcontractor or Supplier will <br /> to furnish or perform any of the Work against whom contain provisions whereby the Subcontractor <br /> or Supplier <br /> CONTRACTOR has reasonable objection. waives all rights against OWNER, CONTRACTOR, <br /> ENGINEER, ENGINEER's Consultants, and all other individuals <br /> S. If the Supplementary Conditions require the identity of or entities identified in the Supplementary Conditions to be listed <br /> certain Subcontractors, Suppliers, or other individuals or entities as insureds or additional insureds (and the officers, directors, <br /> to be submitted to OWNER in advance for acceptance by partners, employees, agents, and other consultants and <br /> OWNER by a specified date prior to the Effective Date of the subcontractors of each and any of them) for all losses <br /> and <br /> Agreement, and if CONTRACTOR has submitted a list thereof damages caused by, arising out of, relating to, or resulting from <br /> in accordance with the Supplementary Conditions, OWNER's any of the perils or causes of loss covered by such policies and <br /> acceptance (either in writing or by failing to make written any other property insurance applicable to the <br /> Work. If the <br /> objection thereto by the date indicated for acceptance or insurers on any such policies require separate waiver <br /> forms to <br /> objection in the Bidding Documents or the Contract Documents) be signed by any Subcontractor or Supplier, CONTRACTOR <br /> of any such Subcontractor, Supplier, or other individual or entity will obtain the same. <br /> so identified may be revoked on the basis of reasonable <br /> objection after due investigation. CONTRACTOR shall submit <br /> 00700 - 17 <br />