Laserfiche WebLink
ENGINEER's review and approval of the pertinent submittal will programs incident thereto. The review and approval of <br /> be at the sole expense and responsibility of CONTRACTOR. a separate item as such will not indicate approval of the <br /> assembly in which the item functions. <br /> D. Submittal Procedures <br /> 3. ENGINEER's review and approval of Shop <br /> 1 . Before submitting each Strop Drawing or Drawings or Samples shall not relieve CONTRACTOR <br /> Sample, CONTRACTOR shall have determined and from responsibility for any variation from the <br /> verified: requirements of the Contract Documents unless <br /> CONTRACTOR has in writing called ENGINEER's <br /> a. all field measurements, quantities, attention to each such variation at the time of each <br /> dimensions, specified performance criteria, submittal as required by paragraph 6. 17. D.3 and <br /> installation requirements, materials, catalog ENGINEER has given written approval of each such <br /> numbers, and similar information with respect variation by specific written notation thereof <br /> thereto; incorporated in or accompanying the Shop Drawing or <br /> Sample approval; nor will any approval by ENGINEER <br /> b. all materials with respect to intended use, relieve CONTRACTOR from responsibility for complying <br /> fabrication, shipping, handling, storage, assembly, with the requirements of paragraph 6. 17. D. 1 . <br /> and installation pertaining to the performance of the <br /> Work; F. Resubmittal Procedures <br /> c. all information relative to means, methods, 1 . CONTRACTOR shall make corrections required <br /> techniques, sequences, and procedures of by ENGINEER and shall return the required number of <br /> construction and safety precautions and programs corrected copies of Shop Drawings and submit as <br /> incident thereto; and required new Samples for review and approval . <br /> CONTRACTOR shall direct specific attention in writing <br /> d. CONTRACTOR shall also have reviewed to revisions other than the corrections called for by <br /> and coordinated each Shop Drawing or Sample with ENGINEER on previous submittals. <br /> other Shop Drawings and Samples and with the <br /> requirements of the Work and the Contract 6. 18 Continuing the Work <br /> Documents. <br /> A. CONTRACTOR shall carry on the Work and adhere <br /> 2. Each submittal shall bear a stamp or specific to the progress schedule during all disputes or disagreements <br /> written indication that CONTRACTOR has satisfied with OWNER. No Work shall be delayed or postponed pending <br /> CONTRACTOR's obligations under the Contract resolution of any disputes or disagreements, except as <br /> Documents with respect to CONTRACTOR's review permitted by paragraph 15.04 or as OWNER and <br /> and approval of that submittal. CONTRACTOR may otherwise agree in writing . <br /> 3.At the time of each submittal, CONTRACTOR 6. 19 CONTRACTOR's General Warranty and Guarantee <br /> shall give ENGINEER specific written notice of such <br /> variations, N any, that the Shop Drawing or Sample A. CONTRACTOR warrants and guarantees to OWNER, <br /> submitted may have from the requirements of the ENGINEER, and ENGINEER's Consultants that all Work will be <br /> Contract Documents, such notice to be in a written corn- in accordance with the Contract Documents and will not be <br /> munication separate from the submittal; and, in addition, defective. CONTRACTOR's warranty and guarantee hereunder <br /> shall cause a specific notation to be made on each excludes defects or damage caused by: <br /> Shop Drawing and Sample submitted to ENGINEER for <br /> review and approval of each such variation. 1 . abuse, modification, or improper maintenance or <br /> operation by persons other than CONTRACTOR, <br /> E. ENGINEER's Review Subcontractors, Suppliers, or any other individual or <br /> entity for whom CONTRACTOR is responsible; or <br /> 1 . ENGINEER will timely review and approve Shop <br /> Drawings and Samples in accordance with the schedule 2. normal wear and tear under normal usage. <br /> of Shop Drawings and Sample submittals acceptable to <br /> ENGINEER. ENGINEER's review and approval will be B. CONTRACTOR's obligation to perform and complete <br /> only to determine if the items covered by the submittals the Work in accordance with the Contract Documents shall be <br /> will, after installation or incorporation in the Work, absolute. None of the following will constitute an acceptance <br /> of <br /> conform to the information given in the Contract Work that is not in accordance with the Contract Documents <br /> or <br /> Documents and be compatible with the design concept a release of CONTRACTOR's obligation to perform the Work in <br /> of the completed Project as a functioning whole as accordance with the Contract Documents: <br /> indicated by the Contract Documents. <br /> 1 . observations by ENGINEER; <br /> 2. ENGINEER's review and approval will not extend <br /> to means, methods, techniques, sequences, or 2. recommendation by ENGINEER or payment by <br /> procedures of construction (except where a particular OWNER of any progress or final payment; <br /> means, method, technique, sequence, or procedure of <br /> construction is specifically and expressly called for by <br /> the Contract Documents) or to safety precautions or <br /> 00700 - 20 <br />