Claim for an adjustment in the Contract Times (or Milestones) <br /> shall be based on written notice submitted by the party making ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION , <br /> the claim to the ENGINEER and the other party to the Contract REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK <br /> in accordance with the provisions of paragraph 10.05. <br /> B. Any adjustment of the Contract Times (or Milestones) 13.01 Notice of Defects <br /> covered by a Change Order or of any Claim for an adjustment in <br /> the Contract Times (or Milestones) will be determined in A. Prompt notice of all defective Work of which <br /> OWNER <br /> accordance with the provisions of this Article 12. or ENGINEER has actual knowledge will be given to <br /> CONTRACTOR. All defective Work may be rejected, corrected, <br /> 12.03 Delays Beyond CONTRACTOR's Control or accepted as provided in this Article 13. <br /> A. Where CONTRACTOR is prevented from completing 13.02 Access to Worts <br /> any part of the Work within the Contract Times (or Milestones) <br /> due to delay beyond the control of CONTRACTOR, the Contrail A. OWNER, ENGINEER, ENGINEER's Consultants, <br /> Times (or Milestones) will be extended in an amount equal to other representatives and personnel m OWNER, independent <br /> the time lost due to such delay if a Claim is made therefore as testing laboratories, and governmental agencies with <br /> provided in paragraph 12.02A Delays beyond the control of jurisdictional interests will have access to the Site and the Work <br /> CONTRACTOR shall include, but not be limited to, ads or at reasonable times for their observation, <br /> inspecting, and <br /> neglect by OWNER, ads or neglect of utility owners or other testing. CONTRACTOR shall provide them proper and safe <br /> contractors performing other work as contemplated by Article 7, conditions for such access and advise them of <br /> fires, floods, epidemics, abnormal weather conditions, or ads of CONTRACTOR's Site safety procedures and programs so that <br /> God. they may amply therewith as applicable. <br /> 12.04 Delays Within CONTRACTOR'S Control 13. 03 Tests and Inspections <br /> A. The Contract Times (or Milestones) will not be A. CONTRACTOR shall give ENGINEER timely notice of <br /> extended due to delays within the control of CONTRACTOR. readiness of the Work for all required inspections, <br /> tests, or <br /> Delays attributable to and within the control of a Subcontractor approvals and shall cooperate with inspection and <br /> testing <br /> or Supplier shall be deemed to be delays within the control of personnel to facilitate required inspections or tests. <br /> CONTRACTOR. B. OWNER shall employ and pay for the services of an <br /> 12.05 Delays Beyond OWNER's and CONTRACTOR's independent testing laboratory to perform all inspections, tests, <br /> Control or approvals required by the Contract Documents except: <br /> A. Where CONTRACTOR is prevented from completing 1 .for inspections, tests, or approvals covered by <br /> any part of the Work within the Contract Times (or Milestones) paragraphs 13.03.0 and 13.03. 13 below, <br /> due to delay beyond the control of both OWNER and 2.that costs incurred in connection with <br /> tests or <br /> CONTRACTOR, an extension of the Contract Times (or <br /> Milestones) in an amount equal to the time lost due to such inspections conducted pursuant to paragraph 13.04. <br />6 <br /> delay shall be CONTRACTOR's sole and exclusive remedy for shall be paid as provided in said paragraph 13.04.B; <br /> and <br /> such delay. <br /> 12.06 Delay Damages 3. as otherwise specifically provided in the Contract <br /> Documents. <br /> A. In no event shall OWNER or ENGINEER be liable to <br /> CONTRACTOR, any Subcontractor, any Supplier, or any other C. If Laws or Regulations rt any public body having <br /> person or organization, or to any surety for or employee or jurisdiction require any Worts ve part thereof) specifically <br /> to be <br /> ee or other <br /> agent of any of them, for damages arising out of or resulting inspected, tested, or approved by a CONpTRACTOR <br /> shall <br /> �: representative of such Public body, <br /> assume full responsibility for arranging and obtaining such <br /> 1 .delays caused by or within the control of inspections, tests, or approvals, pay all costs <br /> in connection <br /> CONTRACTOR; or therewith, and furnish ENGINEER the required certificates of <br /> inspection or approval. <br /> 2.delays beyond the control of both OWNER and <br /> CONTRACTOR including but not limited to fires, floods, D. CONTRACTOR shall be responsible for arranging <br /> epidemics, abnormal weather conditions, ads of God, and obtaining and shall pay all costs in connection with <br /> any <br /> or ads or neglect by utility owners or other contractors inspections, tests, or approvals required for OWNER's <br /> and <br /> performing other work as contemplated by Article 7. ENGINEER's acceptance of materials or equipment to be <br /> incorporated in the Work; or acceptance of materials, mix <br /> B. Nothing in this paragraph 12.06 bars a change in designs, or equipment submitted for approval prior in the <br /> Contrad Price pursuant to this Article 12 to compensate CONTRACTOR's purchase thereof for incorporation <br /> CONTRACTOR due to delay, interference, or disnrptiori directly Work. Such inspections, tests, or approvals shall be pertbrmed <br /> attributable to actions or inactions of OWNER or anyone for by organizations acceptable to OWNER and ENGINEER. <br /> whom OWNER is responsible. <br /> 00700 - 28 <br />