Laserfiche WebLink
2 . In case of discrepancy, the governing order of the contract documents shall be as follows : <br /> 1 . Written Interpretations <br /> 2 , Addenda <br /> 3 , Specifications <br /> 4 , Supplementary Conditions <br /> 5 , General Conditions <br /> 6 , Approved Shop Drawings <br /> 7 , Drawings <br /> 8 , Referenced Standards . <br /> B . Written/computed dimensions shall govem over scaled dimensions . <br /> SC4.02 Subsurface and Physical Conditions <br /> SC4 . 02 Add the following new paragraphs immediately afterparagraph GC 4. 02. B: <br /> C . In preparation of Drawings and Specifications , ENGINEER or ENGINEER's <br /> Consultants relied upon the following reports of explorations and tests of <br /> r subsurface conditions at the Site : <br /> 1 . Report dated N/A , prepared by , <br /> entitled : , consisting of <br /> pages. The "technical data" contained in such report on which <br /> CONTRACTOR may rely is <br /> D . In the preparation of Drawings and Specifications, ENGINEER or ENGINEER's <br /> Consultants relied upon the following drawings of physical conditions in or relating <br /> to existing surface and subsurface structures (except Underground Facilities) which <br /> are at or contiguous to the Site: <br /> 1 . Drawings dated November 2002 , prepared by Masteller & Moler, Inc. . <br /> entitled : King's Hi-ghway 16" Dia . Brine Main consisting of 19 sheets <br /> numbered 1 to 19 , inclusive. All of the information in such drawings <br /> constitutes "technical data" on which CONTRACTOR may rely, except for <br /> N/A appearing on Drawing No. <br /> and appearing on Drawing No, <br /> E . Copies of reports and drawings itemized in SC4.02 . 0 and SC4.02 . D that are not <br /> included with Bidding Documents may be examined at N/A <br /> during regular business hours. These reports and drawings <br /> are not part of the Contract Documents, but the "technical data" contained therein <br /> upon which CONTRACTOR may rely as identified and established above are <br /> incorporated therein by reference. CONTRACTOR is not entitled to rely upon other <br /> information and data utilized by ENGINEER and ENGINEER's Consultants in the <br /> preparation of Drawings and Specifications. <br /> SC4.05 Reference Points <br /> SC4 . 05 Add the following new paragraphs immediately after GC4. 05.A : <br /> ti <br /> B . Contractor is responsible for measuring and recording existing swale <br /> elevations at 100' intervals prior to construction . Existing swale elevations <br /> shall be maintained throughout construction . Contractor is also responsible <br /> for preservation and/or replacement of any and all existing permanent survey <br /> monumentation affected by construction . <br /> 00800 - 2 00800 - Supplementary conditions <br /> Qft DoamWft ions=M - SWpWwtwy Caift"Aw Rev. 05101 <br />