Laserfiche WebLink
a - - 03 <br /> L/ 7 / <br /> °a <br /> SECTION 00530 - EJCDC <br /> STANDARD FORM OF AGREEMENT <br /> BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> THIS AGREEMENT, dated the day ofthe year 2003 by and <br /> between Indian River County, a p itical subdivisiokoofhe St e of Florida (hereinafter called <br /> OWNER) and Tri-Sure Corporation (hereinafter called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br /> agree as follows: <br /> ARTICLE 1. WORK <br /> CONTRACTOR shall complete all work as specified or indicated in the Contract Documents. The <br /> work is generally described as follows: <br /> Construction of approximately 26,500 LF of 16" diameter PVC/D.I.P. force main, <br /> 100 LF of 12" diameter PVC/D.I.P. force main, 125 LF of 8" diameter PVC/D.I.P. <br /> force main, (11) 16" diameter HDPE directional bores (1500 LF), (3) 12" diameter <br /> HDPE directional bores (240 LF), (1) 6" diameter HDPE directional bore ((50 LF); <br /> (2) F.E.C. directional bores, magnetic flow meter w/RTU, air release valves, gate <br /> valves, wet taps and restoration in-kind. Construction consists of, but is not limited <br /> to, utilities exploration, coordination with any permitting agencies, trenching, <br /> dewatering, installation of pipe with fittings and all appurtenances, restrainers and <br /> soil compaction, testing (includes providing temporary jumper or another approved <br /> method for flushing) irrigation repair, private property replacement or repair, <br /> franchise utility repair and traffic control. PVC pipe shall be C-900 and/ or C-909, <br /> C905 and Directional Drill pipe shall be C906 per Indian River County Utility <br /> Standards and Specifications. <br /> CONTRACTOR, as an independent contractor and not as an employee, shall furnish, for the sum <br /> amount of,$1,272,782.50 , all of the necessary labor, material, and equipment to perform the work <br /> described above in accordance with the Contract Documents. <br /> ARTICLE 2. ENGINEER <br /> The project has been designed by Masteller& Moler, Inc., hereinafter called ENGINEER, and who <br /> is to act as OWNER'S representative, assume all duties and responsibilities and have the rights <br /> and authority assigned to ENGINEER in the Contract Documents in connection with completion of <br /> the work in accordance with the Contract Documents. <br /> 00530-1 <br /> C:\DOCUME-1\gordons\LOCALS-1\Temp\00530 EJCDC-REVISED(per Marion)Agreement between Owner and Contractor.doc <br />