Laserfiche WebLink
ORIGINAL <br /> aoa6 - 395 <br /> _ T <br /> 000001 <br /> IA Document G701 - 2001 <br /> Change Order <br /> PROJECT (Name and address): CHANGE ORDER NUMBER: 018 OWNER: El <br /> New County Administration Building DATE: November 14, 2006 ARCHITECT: <br /> Lying Between the Main Relief Canal to <br /> the North, the Lateral D Canal on the CONTRACTOR: <br /> Sounth and East and 20th Avenue to the <br /> West FIELD: ❑ <br /> TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 2102 OTHER: ❑ <br /> Turner Construction Company CONTRACT DATE: (Amendment # 2) August 23, 2005 <br /> 800 N. '.Magnolia Avenue CONTRACT FOR: Guaranteed Maximum Price - <br /> Orlando, Florida 32803 Construction Manager at Risk <br /> THE CONTRACT IS CHANGED AS FOLLOWS: <br /> (include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) <br /> Reference Description Amount <br /> COR 066 Add conduit and wiring and revise Fire Alarm to accommodate Sequence $62,064 <br /> of Operations for Smoke Evacuation System in the Lobby/Atrium areas of <br /> Buildings l and 2 per engineering drawings dated 5/ 18/2006 and 5/ 19/2006. <br /> Also revise Door Hardware for Automatic sliding Glass Doors and Entrance <br /> Doors to permit Fire Code required opening sequence as part of the Smoke <br /> Evacuation System. <br /> The acceptance of this change item will not change the GMP, but will decrease the Owner' s Contingency by $62,064. <br /> The original Guaranteed Maximum Price was $ 33,086,442.00 <br /> The net change by previously authorized Change Orders $ (6,028,590.00) <br /> The Guaranteed Maximum Price prior to this Change Order was $ 27,057,852.00 <br /> The Guaranteed Maximum Price will be increased/decreased by this Change Order in the amount of $ 0.00 <br /> The new Guaranteed Maximum Price including this Change Order will be $ 27,057,852.00 <br /> The Contract Time will be .increased by Zero ( 0 ) days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is January 21 , 2007. <br /> NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which <br /> have been authorized by Construction Change Directive until the cost and time have been agreed upon by bath the Owner and <br /> Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br /> NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br /> Donadio & Associates, Architects, P.A. Turner Construction Company Indian River County Board of County <br /> Commissioners <br /> ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) <br /> 609 17th Street, Vero Beach, Florida 1840 25th Street, Vero Beach,Florlda <br /> 32960 32960 <br /> ADDR SS r ADORE ADDRESS <br /> 71 . K. "Wa CP—OA) <br /> BY (Signature) BY (Signatur (Signata ) <br /> Anthony Donadio Louis Fiore s ph A. Baird, County Administrator <br /> (Typed n40446 <br /> me) (Typed name) ( _ ped name <br /> d //L,&tbrh) <br /> DATE I DATE DATE <br /> AIA Document WNW — 2001 . Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. A""' This AIA'' <br /> Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAa current, or any 1 <br /> portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent p Ible under the I document <br /> was produced by AIA software at 17:31 :35 on 11 /07/2006 under Order No. 1000250302_1 which expires on 7/25/20 an 's not for resal <br /> User Notes: 12914) <br /> Rev i a -Mecommended for Approval : <br /> Steve Blum. Project Manaser Thomas W. Frame, CenerallServices Director anon Town. Budget Director <br />