My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-352
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2016 1:20:24 PM
Creation date
9/30/2015 11:22:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
10/16/2007
Control Number
2007-352
Agenda Item Number
7.M.
Entity Name
Turner Construction
Subject
Change Order No.33
Area
New County Administration Building
Supplemental fields
SmeadsoftID
6646
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Turner <br /> July 19, 2007 <br /> Mr. Steve Blum <br /> Project Manager <br /> Indian River County Administration Complex <br /> 2625 19th Avenue <br /> Vero Beach , FL 32960 <br /> RE: IRC New Admin Building <br /> 2625 19th Avenue <br /> Vero Beach , Florida 32960 <br /> Project #: 11531 <br /> Change Order Request Number COR-111 <br /> Scope Change <br /> Dear Mr. Blum, <br /> We have finalized gathering all the required information and pricing for PCO's 39.3, 112, and 123 for the following <br /> extra work: Final AV Allowance Adjustment, Pave Existing Parking Lot, & Paint Exterior of Existing Health <br /> Department Building. PCO's 112 and 123 were previously approved in AIA Change Order 028. This COR <br /> confirms the funding source outside of the Owner's Contingency and inside the GMP. The balance of the AV <br /> Allowance of $15,000. is transferred to the Owner's Contingency. The following is a Summary of costs involved: <br /> PCO No Item No Description Amount Contractor <br /> 039.3 001 Release Hold Allowance for Additional AV Work ($ 100,000. ) TURCON <br /> in PCO 39. Fund Existing Health Department <br /> Paving and Painting . <br /> 039.3 002 Increase Owner's Contingency-Final AV $ 15,000 . INDRIV <br /> Allowance Remaining after Funding of Existing <br /> Health Dept Paving and Exterior Painting. <br /> 123 001 Paint Exterior of Existing Health Department $15,000 . Included in AIA <br /> Building per Elevation Sketches issued by CO 28 <br /> Architect. Includes pressure cleaning, priming <br /> and repainting . Also, includes patching of cracks, <br /> sealant joints, and minor rusted areas. Does not <br /> include replacement of perimeter glazing sealant. <br /> 112 001 Add 314" asphalt overlay on Existing Health $70 , 000. Included in AIA <br /> Department Parking Lot, including painting of CO 28 <br /> stalls, remove and replace Wheel Stops , and <br /> addition of 920 LF of curb. <br /> Total Change to the GMP: $0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.