My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-078
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2016 1:40:55 PM
Creation date
10/1/2015 12:01:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
03/04/2008
Control Number
2008-078
Agenda Item Number
11.J.1
Entity Name
Underground Utilities, Inc
Subject
Work Authorization Directive No.2007-015 Water Main Replacement
Area
Schumann Drive E/O Kildare Drive
Bid Number
2007026
Supplemental fields
SmeadsoftID
6925
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE ; <br /> No. 1007-015 <br /> SCHUMANN DRIVE E/O KILDARE DRIVE 12" WATER MAIN REPLACEMENTPROJECT <br /> DATE OF ISSUANCE : March 2008 EFFECTIVE DATE: March 2008 <br /> OWNER : Indian River County <br /> CONTRACTOR: Underground Utilities, Inc <br /> CONTRACT : WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / <br /> EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT BID NO 2007026 February <br /> 6, 2007 <br /> PROJECT: Replace 12" DI Water Main Across Waterwav east of Kildare Dr. with Dir. Bore 16" HDPE <br /> COUNTY UTILITY PROJECT NO. : UCP #3045 CONTRACTOR' S PROJECT--NO. : <br /> COUNTY W.I.P . No. 471 - 23536-044699-08508 <br /> You are directed to proceed promptly with the following work: <br /> Description: <br /> Construct about 340 feet of 12" HDPE directional bore across Waterway east of Kildare Dr. <br /> Method of determining Contract Price: <br /> ❑X Unit Prices: Bid Items as established pursuant to Bid No 2007026, and awarded by the Board of <br /> County Commissioners on February 6, 2007 to Underground Utilities, Inc. <br /> ❑ Lump Sum <br /> ❑ Cost of the Work <br /> The Cost of Labor, Contingency and Contract Time is summarized below : <br /> Estimated Labor Cos[ _ $37,081 .20 Estimated Contract Time: 60 days <br /> Total Estimated Labor Costs = $37,081 .20 <br /> ACCEPTED: s RECOMMENDED : APPROVED: <br /> By: (J � <br /> !Chalrman <br /> Un ergro UtilitiesInc. E NEEdra LBowden, <br /> , BCC <br /> Date: Date: Date : <br /> ZD O� %rch 4 , 2008 <br /> Attachment 2 <br /> FaUtilities`'UTILITY - ENG INEERINGAProjects - Utility Construction PcrmitsVI RC - Schumann Drive at Kildare Dr. WM Replacement UCP <br /> 03045VA - Work Authorization No. 2007-015 Attachment 2.doc9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.