My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-078
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:54:01 AM
Creation date
10/1/2015 12:01:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
03/04/2008
Control Number
2008-078
Agenda Item Number
11.J.1
Entity Name
Underground Utilities, Inc
Subject
Work Authorization Directive No.2007-015 Water Main Replacement
Area
Schumann Drive E/O Kildare Drive
Bid Number
2007026
Supplemental fields
SmeadsoftID
6925
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE; <br />No. 1007-015 <br />SCHUMANN DRIVE E/O KILDARE DRIVE 12" WATER MAIN REPLACEMENTPROJECT <br />DATE OF ISSUANCE: March 2008 <br />OWNER: Indian River County <br />CONTRACTOR: Underaround Utilities. Inc <br />EFFECTIVE DATE: March 2008 <br />CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / <br />EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT BID NO 2007026 February <br />6, 2007 <br />PROJECT: Replace 12" DI Water Main Across Waterwav east of Kildare Dr. with Dir. Bore 16" HDPE <br />COUNTY UTILITY PROJECT NO.: UCP #3045 CONTRACTOR'S PROJECT --NO.: <br />COUNTY W.I.P. No. 471- 23536-044699-08508 <br />You are directed to proceed promptly with the following work: <br />Description: <br />Construct about 340 feet of 12" HDPE directional bore across Waterway east of Kildare Dr. <br />Method of determining Contract Price: <br />❑X Unit Prices: Bid Items as established pursuant to Bid No 2007026, and awarded by the Board of <br />County Commissioners on February 6, 2007 to Underground Utilities, Inc. <br />❑ Lump Sum <br />❑ Cost of the Work <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Estimated Labor Cost = <br />$37,081.20 <br />Estimated Contract Time: <br />60 days <br />PermitsVRC - <br />Total Estimated Labor Costs = <br />$37,081.20 <br />UCP <br />ACCEPTED: <br />RECOMMENDED: <br />B : By; <br />C� O <br />Un ergroryn Utilities, Inc. E NEE <br />Date: <br />Date: <br />APPROVED: <br />!Chalrman <br />dra LBowden, <br />, BCC <br />Date: <br />March 4, 2009 <br />Attachment 2 <br />FaUtilities`'UTILITY <br />- ENG INEERINGAProjects- <br />Utility <br />Construction <br />PermitsVRC - <br />Schumann Drive at Kildare Dr. WM <br />Replacement <br />UCP <br />03045VA <br />- Work Authorization No. 2007-015 <br />Attachment 2.doc9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.