Laserfiche WebLink
Indian River County Department of Utilities <br /> COST ESTIMATE and CONTRACTOR'S BID ITEM LIST <br /> Project: IRC — Schumann Dr. at Kildare Dr. !Utility Canal Crossings Replacement Project <br /> Description: U'CPa 3045, WIP a 471-23536-044699-08508 <br /> Date: Fell 8, 2008 <br /> LABOR COSTS MATE.RIALCOSTS <br /> Bid Bid Item Estimated Unit of Labor Unit Total Labor Material Unit Total Material <br /> Item No. DescriptionQuantity Measure Price Price Price Price <br /> 63 Mobilization 2 4% HREF1 <br /> $ 1426.20 <br /> 051 Inzlall 12" HOPI. DR I I Directional Drill Pomo Main 340 LF $80.00 529,20000 $21 .38 $]2]2.60 <br /> 086 Inaal[ MJRcan:aincd Jonson Existing Mani. 10 throulgi 4 FA $200.00 $801 $11164 S446 Sfi <br /> 011 Install I " ll WaterMain 40 <br /> - I F %200 $480.00 $1528 Sid 120 <br /> 07 Install MJRDI Fiainys I TONS $1 ,66500 $1 665.00 <br /> $25001111 $2.500.00 <br /> His Outnll Restrained Joints on hxlaing Main 6 LA $200.00 $ 1 .20000 Sl11 .64 $669.84 <br /> 106 Remove and Dispose of Pipe 10" through 12 ' 340 1 ,F $400 51 ,360,1111 <br /> I6a Water Service - S,1RcShanw/ X314" meter I I-A $800.00 $80000 535150 $351 .50 <br /> 21 Potholes 6GA $150,00 $900.00 <br /> 2721 bisodl Tcmp. Sample Polnta 2 EA $200.00 $400.00 $24594 $49188 <br /> 376 Olhtam dant_ Sample Take to Lah EA $125.00 $250.00 $ 100.1111 520000 <br /> $9a I awn Rcsloretion (Tosoil &Sod) 100 LF VOW $600.00 $250 <br /> $25000 <br /> Subotal Water l'ac ifillas $35,65500 <br /> _ T0Ia1 Water Fac,l It lcs with Mori l izati ni S37o8110 S12,993.511 <br /> Total Project Cosl 549,894.98 <br /> Attachment 1 <br />