My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-377
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-377
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 11:56:09 AM
Creation date
9/30/2015 10:15:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Plan
Approved Date
10/24/2006
Control Number
2006-377
Agenda Item Number
11.J.5.
Entity Name
Indian River County Department of Utility Services
Subject
Water & Wastewater Standards-updated October 2006
Supercedes all previous versions
Supplemental fields
SmeadsoftID
5936
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY <br /> DEPARTMENT OF UTILITY SERVICES <br /> SURVEY REQUIREMENTS <br /> 1 . All Construction and/or Route surveys shall meet the minimum requirements of <br /> the Chapter 61G67 , Florida Administration Code Pursuant to section 472 of the <br /> Florida Statutes . <br /> 2 . All state plane coordinates shall be based on the Florida State Plane Horizontal <br /> data ( East Zone); or Florida High Precision Geodetic Network ( superstation ) and <br /> NAD 83/1999 — final adjustment, or the most current datum adopted by Indian <br /> River County . <br /> 3 . All elevations shown shall be based on 1929 NGVD , or the most current datum <br /> adopted by Indian River County. <br /> 4 . All incoming route construction survey drawings shall be received on a CD , as an <br /> electronic copy, AutoCad 2000 format, with a tie to a minimum of two (2 ) state <br /> plane coordinates . ( NOTE : Prior to submitting the electronic copy, one ( 1 ) copy <br /> of each as-built (24"x36") shall be submitted for review and approval . After all <br /> approvals, a (24"x36" ) Mylar reproducible along with five ( 5 ) signed and sealed <br /> copies of each as-built shall be submitted . <br /> 5 . All construction surveys shall be tied to a minimum of one ( 1 ) permanent <br /> reference monument ( P . R. M . ) at the end of each project. One P . R . M . shall be <br /> tied to a minimum of one ( 1 ) section corner or one-quarter ( 1 /4 ) section corner <br /> whichever is closest to the project . State plane coordinates shall be physically <br /> shown on the drawing next to the P . R . M . used . <br /> 6 . All surveys that are required for the use of engineering design , and are located <br /> within a distance of one ( 1 ) mile from any Indian River County Global Positioning <br /> System ( G . P . S . ) control project monuments , shall be tied into the GPS <br /> monument from one ( 1 ) permanent reference point or the subdivision corner that <br /> is along the survey route and shall then be tied to the survey base line . <br /> .. 7 . Horizontal Control Monumentation for utility lines shall be a minimum of two ( 2 ) <br /> points at a maximum of 1 , 400 feet between points and shown on all plans . <br /> 8 . Vertical Control (when required ) for linear utility lines , such as sewer, shall have <br /> a maximum of 1 , 100 feet between existing construction or established <br /> r <br /> benchmarks . <br /> INDIAN RIVER COUNTY �o� CONSTRUCTION / ROUTE DRAWING <br /> DEPARTMENT OF NO , <br /> UTILITIES SERVICES ,� � � SURVEY REQUIREMENTS M - 16 <br /> Lo . : u. �. CA ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.