Laserfiche WebLink
S . Depth of Cover and Pipe Elevation : Unless otherwise shown on <br /> the drawings , or otherwise authorized by the Engineer, all pipe <br /> shall have a minimum cover of 36 inches. Contractor shall <br /> .. determine top of pipe elevation and top of ground elevation for <br /> every two joints of pipe installed using a level . Pipe must have the <br /> minimum cover described above and must be within +/- 0. 2 feet of <br /> M the top of pipe elevation indicated on the drawings. Installed pipe, <br /> which does not meet these requirements , shall be reinstalled until <br /> it does meet these requirements. Contractor shall record top of <br /> pipe and top of ground elevations and the locations of where <br /> these elevations were determined and submit this information to <br /> Engineer or his representative. Engineer reserves the right to <br /> have Contractor excavate and check top of pipe and top of ground <br /> elevations to see if they conform to the aforementioned <br /> requirements, at no cost to the IRCDUS. <br /> +� END OF SECTION <br /> i <br /> r <br /> r <br /> r <br /> r <br /> r <br /> i <br /> r <br /> r <br /> 1 - 5 <br /> r <br />