Laserfiche WebLink
must have the minimum cover described above and must be <br /> within +/- 0 .2 feet of the top of pipe elevation indicated on the <br /> drawings . Installed pipe , which does not meet these <br /> requirements, shall be reinstalled until it does meet these r <br /> requirements . Contractor shall record top of pipe and top of <br /> ground elevations and the locations of where these elevations <br /> were determined and submit this information to Engineer or his .. <br /> representative . Engineer reserves the right to have Contractor <br /> excavate and check top of pipe and top of ground elevations to <br /> see if they conform to the aforementioned requirements. <br /> END OF SECTION <br /> i <br /> 2 - 4 <br />